BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 13, 2025 at 8:00 PM

Updated June 25, 2025

Renovation of a municipal facility in Dodgeville, Wisconsin. Completed plans call for the renovation of a municipal facility.

This project is being let using the single prime bidding and contracting process. DFD will publicly bid the applicable mechanical, electrical, plumbing, and fire protection (MEP) divisions of work first. Within 5 days of the MEP bid opening, DFD will identify a lowest, qualified, responsible, certified bidder in each applicable MEP division of work. These successful MEP bids must be included in all general prime contractor bids received. No later than 5 days after DFD identifies the successful MEP bids, DFD will publicly open general prime contractor bids. General prime contractor bids that do not include the successful MEP bids will be rejected. The state will enter into a single contract with the lowest, qualified, responsible, certified general prime contractor and this general prime contractor will enter into subcontracts with the successful MEP bidders. In general, the work consists of: interior and exterior renovations at DNR facilties in Dodgeville and Fitchburg Wisconsin. At Dodgeville (approximately 9,300 square feet): Replace existing exterior windows with aluminum clad wood windows. Replace cedar siding with exposed fastener metal panel siding. Infill existing door and replace trim at openings. Replace select flooring with carpet and luxury vinyl tile. Paint select interor walls. Replace interior lighting system. At Fitchburg (approximately 25,000 square feet): Replace existing flooring with carpet. Bid Guarantee in the amount of 10% of the Bid must accompany each bid submitted. It is encouraged that contractors attend. Please contact Doug Ramsey, 608-784-1830, dramsey@hsrassociates.com for additional information. Event Bid note: PDF scanned file of all required bid documents, including bid and bid bond forms with original wet signatures or properly transmitted electronic signatures (only PDF files will be accepted) submitted via the eBuilder Bidding Portal (this is the preferred method);

Bid Results

Municipal

$662,050.00

Public - State/Provincial

Renovation

14

20

9

5

Subscribe For Documents

32 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
49
Active Projects
3
Bidding Soon
768
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 6, 2025

June 5, 2025

Project location map

Multiple Locations, Dodgeville, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.