Renovation of a mixed-use development in Lake Ronkonkoma, New York. Completed plans call for the renovation of a educational facility.

The Contractor shall provide all the required labor, material and equipment for the Asbestos Abatement work and removal of asbestos containing materials(ACM) specified herein. The work shall include but not be limited to the following ACM PIPE WRAP The work consists of the removal of all asbestos containing material (ACM) pipe wrap and mud joints at the locations noted on the contract drawings. The Contractor is required to inspect, and field measure all existing ACM to become familiar with the scope of work and to adequately submit their bid. Reinsulation of all abated piping and joints shall be part of this project see below; a. Reinsulation Work shall be part of this scope of work as follows 1. The work of this contract also involves the insulation of all building heating and piping both associated with heating and domestic hot water include all valves, fittings, etc., in the defined work areas. All the existing insulation in the work area shall be removed under the terms of this contract whether specifically indicated on the drawings or not. Drawings give general location of major piping. The Contractor is required to field measure all existing ACBM to adequately submit a bid. The installation of new insulation on all piping is a part of this contract whether they had existing ACBM on them initially or not. 2. All insulation shall be in accordance with the following schedule and shall be as manufactured by Johns 'Manville, Gustin-Bacon or OwensCorning. Installation shall be in accordance with the manufacturer's methods and recommendations. When work is being performed within boiler rooms, the ACBM insulation work covers all existing piping, breeching and tank covering in the existing boiler rooms and adjacent spaces. Installation shall be in accordance with manufacturer's recommendations. Minimum pipe insulation shall be installed in accordance with Table 803.3.7 of the Energy Conservation Construction Code of New York State. 58-02-05-06-0-008-035-SAMOSET MIDDLE SCHOOL 58-02-05-06-0-010-029-SAGAMORE MIDDLE SCHOOL 58-02-05-06-0-011-022-HIAWATHA ELEMENTARY SCHOOL 58-02-05-06-0-016-035-SACHEM HIGH SCHOOL NORTH 58-02-05-06-0-017-022-SENECA MIDDLE SCHOOL 58-02-05-06-0-050-013-SACHEM HIGH SCHOOL EAST Bid security in an amount not less than ten percent (10%) of the base bid and all Alternate Bids must be submitted with sealed bids. All contractors must comply with the Article 8 of the New York State Labor Law. The Sachem Central School District reserves the right to reject any or all bids submitted, to waive any informality or irregularity and/or to accept any bid in whole or in part and/or to award or not award the contract, if it is in the best interest of the School District.

Post-Bid

Educational

$523,000.00

Public - County

Renovation

36

7

10

7

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
798
Active Projects
410
Bidding Soon
6,517
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 28, 2025

June 30, 2025

Project location map

Multiple Locations, Lake Ronkonkoma, NY

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.