EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 31, 2025 at 8:00 PM

Updated October 1, 2024

Renovation of a mixed-use development in Lake Ronkonkoma, New York. Completed plans call for the renovation of a educational facility.

The Contractor shall provide all the required labor, material and equipment for the Asbestos Abatement work and removal of asbestos containing materials(ACM) specified herein. The work shall include but not be limited to the following ACM PIPE WRAP The work consists of the removal of all asbestos containing material (ACM) pipe wrap and mud joints at the locations noted on the contract drawings. The Contractor is required to inspect, and field measure all existing ACM to become familiar with the scope of work and to adequately submit their bid. Reinsulation of all abated piping and joints shall be part of this project see below; a. Reinsulation Work shall be part of this scope of work as follows 1. The work of this contract also involves the insulation of all building heating and piping both associated with heating and domestic hot water include all valves, fittings, etc., in the defined work areas. All the existing insulation in the work area shall be removed under the terms of this contract whether specifically indicated on the drawings or not. Drawings give general location of major piping. The Contractor is required to field measure all existing ACBM to adequately submit a bid. The installation of new insulation on all piping is a part of this contract whether they had existing ACBM on them initially or not. 2. All insulation shall be in accordance with the following schedule and shall be as manufactured by Johns 'Manville, Gustin-Bacon or OwensCorning. Installation shall be in accordance with the manufacturer's methods and recommendations. When work is being performed within boiler rooms, the ACBM insulation work covers all existing piping, breeching and tank covering in the existing boiler rooms and adjacent spaces. Installation shall be in accordance with manufacturer's recommendations. Minimum pipe insulation shall be installed in accordance with Table 803.3.7 of the Energy Conservation Construction Code of New York State. 58-02-05-06-0-008-035-SAMOSET MIDDLE SCHOOL 58-02-05-06-0-010-029-SAGAMORE MIDDLE SCHOOL 58-02-05-06-0-011-022-HIAWATHA ELEMENTARY SCHOOL 58-02-05-06-0-016-035-SACHEM HIGH SCHOOL NORTH 58-02-05-06-0-017-022-SENECA MIDDLE SCHOOL 58-02-05-06-0-050-013-SACHEM HIGH SCHOOL EAST Bid security in an amount not less than ten percent (10%) of the base bid and all Alternate Bids must be submitted with sealed bids. All contractors must comply with the Article 8 of the New York State Labor Law. The Sachem Central School District reserves the right to reject any or all bids submitted, to waive any informality or irregularity and/or to accept any bid in whole or in part and/or to award or not award the contract, if it is in the best interest of the School District.

Post-Bid

Educational

$523,000.00

Public - County

Renovation

36

7

10

7

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Submittal Procedures, Certificates, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Construction Facilities, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Closeout Submittals, Bonds, Warranties, Commissioning
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Facility Remediation, Transportation and Disposal of Hazardous Materials, Asbestos Remediation
Division 04 - Masonry

Division 04 - Masonry

Masonry, Maintenance of Masonry, Stone Cleaning, Stone Restoration, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Metal Fabrications
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Finish Carpentry
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Wood Doors, Windows, Hardware, Door Hardware, Glazing, Glass Glazing, Louvers and Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Gypsum Board, Tiling, Ceramic Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Terrazzo Flooring, Wall Finishes, Wall Coverings, Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Visual Display Surfaces, Tackboards, Signage, Interior Specialties, Partitions
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Rugs and Mats, Runners, Furniture
Division 13 - Special Construction

Division 13 - Special Construction

Special Facility Components, Fountains
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Escalators and Moving Walks
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Insulation, Plumbing Equipment, Domestic Water Filtration Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Piping, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, Air Outlets and Inlets
Division 26 - Electrical

Division 26 - Electrical

Electrical, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Low-Voltage Circuit Protective Devices, Fuses, Facility Electrical Power Generating and Storing Equipment, Lighting, Interior Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Excavation and Fill, Fill
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving
Division 33 - Utilities

Division 33 - Utilities

Electrical Utilities, Utility Substations
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Container Processing and Packaging, Container Filling and Sealing
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
446
Active Projects
243
Bidding Soon
4,334
All Active Projects
2,034
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 28, 2025

June 30, 2025

img_map_placeholder

Multiple Locations, Lake Ronkonkoma, NY

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Sachem CSD- 2024/2025 Capital Improvement Program - Contract 2 - Bathroom Reconstruction

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.