BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 10, 2025 at 8:00 PM

Updated June 11, 2025

Site work for a water / sewer project in Lahaina, Hawaii. Working plans call for site work for a water / sewer project.

The owner has determined a prequalified list of general contractors. Lahaina Water System Improvements Design-Build Construction The procurement for the Project involves a two-step process. The RFP Part 1 process will solicit proposals from prospective Offerors as stated in RFP Part 1 Pre- Qualification of Offerors. In accordance with RFP Part 1, an evaluation will be conducted of each Proposal received and, on the basis of the evaluation, a list of no more than three Pre-Qualified Offerors eligible to respond to RFP Part 2 to perform the design-build Project will be generated. The RFP Part 2 process will follow the submission requirements and evaluation outlined in RFP Part 2. Prospective Offerors are directed to Procurement Process for detailed information on the procurement process for this solicitation. This Project is funded by The County of Maui General Fund and requires that the contract for this RFP be executed by June 30, 2025. RFP Part 1 Pre-Qualification of Offerors Deadline for Written Inquiries to Part 1 March 28, 2025 Response to Written Inquiries to Part 1 April 4, 2025 Pre-Qualification Notice April 25, 2025 RFP Part 2 Design-Build Proposals Discussions with Pre-Qualified Offerors May 2, 2025 Deadline for Written Inquiries to Part 2 May 9, 2025 Response to Written Inquiries to Part 2 May 16, 2025 Tentative Award Date May 30, 2025 Contract Execution By June 30, 2025 The Procurement Officer for this solicitation is: W. Justin Rodden. Engineering Division Department of Water Supply, County of Maui 200 South High Street, Fifth Floor Wailuku, Hawaii 96793 Phone: 808.270.7667 email: William.J.Rodden@co.maui.hi.us The purpose of this project is to upsize existing water lines within the specified service area (See Appendix I for service area) to meet current standards of velocity and pressure for water distribution and fire protection. This includes the replacement or upgrading of existing water lines, installation of new appurtenances, and ensuring that all modifications are consistent with current engineering standards and regulations.

Final Planning

Water / Sewer

$5,000,000.00

Public - County

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

11

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
16
Active Projects
3
Bidding Soon
116
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 23, 2025

June 30, 2025

Project location map

Multiple Locations, Lahaina, HI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.