Site work and renovation of an educational facility in Cherry Hill, New Jersey. Completed plans call for the renovation of a educational facility; and for site work for a educational facility.

Disclaimer: Please contact via email, chboebids@erinj.com for bid documents in order to bid on this project. sealed envelope, clearly marked with the name of the Bidder and the name of the Project and the Bid# as described in this Notice to Bidders; and must be received by not later than the time designated in this Notice to Bidders. No responsibility will attach to Architect or Owner for premature opening of a bid which is not properly identified. The Bidder and named Prime Subcontractors must be pre-qualified prior to the date that bids are received. Bids must be accompanied by a certified check, bank cashier's check, treasurer's check or Bid Bond in the form provided in the Contract Documents, with corporate surety satisfactory to the Owner, in an amount of 10% of the Base Bid, but in no case in excess of $20,000.00 The right is reserved to reject all bids Friday 04/04/25 Deadline for Questions to ERI at 5:00 P.M. (send questions to nwerket@erinj.com, ggiangiulio@erinj.com and yperalta@erinj.com) Friday 04/11/25 Deadline for Addendum Issued to Bidders (If Necessary)

GC Bidding

Educational

$930,000.00

Public - City

Renovation, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Assurance, Mockups, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Project Identification, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Closeout Submittals, Bonds, Warranties
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Existing Conditions, Site Remediation, Chemical Decontamination
Division 03 - Concrete

Division 03 - Concrete

Cast-in-Place Concrete, Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Masonry, Unit Masonry, Clay Unit Masonry, Concrete Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Joists, Metal Fabrications, Metal Railings
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Wood, Plastics, and Composites, Common Work Results for Wood, Plastics, and Composites, Rough Carpentry, Sheathing
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing
Division 08 - Openings

Division 08 - Openings

Hardware, Glazing, Glass Glazing, Mirrors
Division 09 - Finishes

Division 09 - Finishes

Flooring, Terrazzo Flooring, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Traffic Signage
Division 12 - Furnishings

Division 12 - Furnishings

Furniture, Residential Furniture, Beds
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Lifts
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Finish Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Embankments, Earthwork Methods, Soil Stabilization, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Mowing, Bases, Ballasts, and Paving, Rigid Paving, Concrete Paving, Curbs and Gutters, Paving Specialties, Pavement Markings, Planting, Turf and Grasses, Plugging, Seeding, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Storm Drainage Utilities, Culverts
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Piece Material Handling Equipment, Cranes and Hoists, Hoists, Lifting Devices, Lifts
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
441
Active Projects
234
Bidding Soon
3,903
All Active Projects
1,901
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 22, 2025

May 22, 2025

img_map_placeholder

Multiple Locations, Cherry Hill, NJ


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

James F. Cooper Elementary School and Henry C. Beck Middle School Site Improvements

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.