Published April 1, 2025 at 8:00 PM

Updated April 5, 2025

Site work for a water / sewer project in Phoenix, Arizona. Completed plans call for site work for a water / sewer project.

Questions pertaining to this selection process or contract issues should be directed to the Contract Specialist, Julie B. Smith at (602) 534-2418 or julie.b.smith@phoenix.gov (preferred) - PROJECT DESCRIPTION The Water Main Replacement Program evaluates and replaces aging water mains within the City of Phoenix. The primary focus of the program is currently water mains in alleys and easements which have historically had high break rates and are difficult to repair. Work for this project will include installation of new 6" to 12" water mains, multiple cut and plugs, and installation or relocation of fire hydrants. Coordination with City staff and plumbing contractors regarding relocation of water services may also be required. SCOPE OF WORK The CMAR will begin with the firm in an agency support role for preconstruction services. CMAR will replace or rehabilitate approximately 46,920 Linear Feet with 35,155 LF of 6" Main, 7,435 LF of 8" Main, & 3,215 LF of 12" Main, and 60 Fire Hydrant's, 25 Cut & Plugs & 451 Service Lines. The CMAR will assume the risk of delivering the project through a Guaranteed Maximum Price (GMP) contract. The CMAR will be responsible for construction means and methods and will be required to solicit bids from prequalified subcontractors to perform the work using the City's subcontractor selection process. For this project the CMAR is responsible for self-performing a minimum of 45% of the construction work as measured by total contract price for construction. A. Preconstruction phase services by the CMAR may include the following: o provide detailed cost estimating and knowledge of marketplace conditions o provide project planning and scheduling o provide for construction phasing and scheduling that will minimize interruption to City operations o provide alternate systems evaluation and constructability studies o advise City on ways to gain efficiencies in project delivery o provide long-lead procurement studies and initiate procurement of long-lead items o assist in the permitting processes o participate with the City in a process to set a goal for local and SBE participation and implement the local and SBE process o protect the City's sensitivity to quality, safety, and environmental factors o advise City on choosing green building materials. B. Construction phase services by the CMAR may include: o rehabilitate 46,920 linear feet of water mains o select subcontractors/suppliers for this project o prepare a Guaranteed Maximum Price (GMP) proposal that meets the approval of the City The GMP must be submitted in MAG or CSI format, or it will not be accepted o coordinate with various City of Phoenix departments, other agencies, utility companies. o arrange for procurement of materials and equipment o schedule and manage site operations o bid, award, and manage all construction related contracts while meeting City bid requirements including the local and SBE participation goal o provide quality controls o bond and insure the construction o address all federal, state and local permitting requirements o deal with City issues o maintain a safe work site for all project participants Use of UNIFIER, an Application Service Provider (ASP) web-based project management database, may be required. The following information provides a guideline for utilization. Any questions related to the requirements of UNIFIER should be directed to the Project Manager. o The CMAR will be required to maintain all project records in electronic format. o The City provides an ASP web-based project management database which the CMAR will be required to utilize in the fulfillment of the contract requirements. o The CMAR shall provide a computerized networked office platform with broadband internet connectivity. o UNIFIER training will be provided through the City of Phoenix to firms under contract. PRE-SUBMITTAL MEETING TEAMS INFORMATION: Join the meeting now Meeting ID: 226 076 648 27 Passcode: Nn3qf7aw

Post-Bid

Water / Sewer

$10,825,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

6

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
108
Active Projects
56
Bidding Soon
938
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 4, 2025

August 4, 2025

Project location map

Multiple Locations, Phoenix, AZ

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.