BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 30, 2025 at 8:00 PM

Updated May 31, 2025

Renovation of an educational facility in Glassboro, New Jersey. Completed plans call for the renovation of a educational facility.

Rowan Hall Lab 131 Phase 2 All potential bidders are required to comply with the requirements of N.J.S.A. 10:5-31 et seq. and N.J.A.C. 17:27. Rowan University is an Equal Opportunity Employer. Please direct any questions to bids@rowan.edu or 856-256-4171. 1. The scope of work shall not be limited to what is specifically called out on the drawings and/or specifications, but shall include any and all demolition, temporary work, protection of stockpiled materials for re-use, dewatering, cutting and patching, temporary protection and shoring, and all work as required to accomplish the intended construction. 2. The contractor will be permitted to conduct their building surveys once the letter of award is issued. Contractor shall also begin the submittal process. 3. Contractor must outline in their bid any long lead items that may impact their ability to meet the deadlines of the schedule. Failure to advise of long lead items shall preclude Contractor from right to additional time and/or costs associated with such delay. 4. Rowan University has submitted the Plans and Specification to The Department of Community Affairs (DCA) for the Plan Review Process. 5. Contractor is responsible for submitting and securing all necessary permits to complete the work. 6. Bid shall include all work shown on the Contract Drawings, Technical Specifications, and other documents issued under this IFB. 7. Contractor must follow all OSHA and Rowan safety guidelines and procedures. 8. Contractor shall Schedule and Coordinate all work activities with Rowan University. 9. Contractor must bid the project to meet the schedule outlined in the bid documents which may include weekend and/or shift work. Contractor must staff the project accordingly to meet the schedule since the end date is firm. Rowan will not entertain change orders for contractor's inability to meet this schedule or time extensions. 10. Contractor is responsible to schedule and manage all required inspections, including but not limited to Final Certificate of Occupancy inspection. 11. Contractor is required to maintain a clean job site and to turn over the building back to the owner in the condition is was received. 12. Contractor is responsible to perform final cleaning prior to Final Turn Over and Owner's Final Acceptance. Questions Due 3/25/25

Award

Educational

$590,000.00

Public - State/Provincial

Renovation

12

24

3

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
640
Active Projects
207
Bidding Soon
4,834
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 3, 2025

May 16, 2025

Project location map

600 North Campus Drive, Glassboro, NJ

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.