EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 29, 2025 at 8:00 PM

Updated May 30, 2025

Site work for a water / sewer project in Jersey City, New Jersey. Completed plans call for site work for a water / sewer project.

The work under this contract consists generally of flood wall system, deployable water intrusion protection systems, storage containers for offsite floodwall components, maintenance of traffic and protection of work zone and related work at Greenwich Street, Fulton Street, Liberty Street; Tower 3, Tower 4 and the Oculus Transportation Hub entrances; 9/11 Museum and Memorial, Transportation Hub, and vicinities thereof at the World Trade Center, New York, New York. This project may be federally funded in whole or in part. Accordingly, all bidders and the successful Contractor will be required to comply with any and all required applicable federal provisions and requirements contained in this solicitation and resulting contract. For questions, call Alvin Chen at (212) 435- 4636 or email - alchen@panynj.gov. Estimate Range: $2.5M - $5M. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Docs notes: Prospective bidders may obtain contract documents containing protected information by sending an email request to the Procurement Contract Specialist whose contact information is listed. After meeting the Information Security Handbook Requirements, a link for downloading the contract documents will be provided by the Authority. The contract documents will be made available electronically to the prospective bidder at no cost, as soon as they become available. For availability of contract documents, go to online . flood wall system, deployable water intrusion protection systems, storage containers for offsite floodwall components, maintenance of traffic and protection of work zone and related work at Greenwich Street, Fulton Street, Liberty Street; Tower 3, Tower 4 and the Oculus Transportation Hub entrances; 9/11 Museum and Memorial, Transportation Hub, and vicinities thereof at the World Trade Center, New York, New York Intent to Bid Due Date: May 20th 2025, 2:30 PM EDT

Bid Results

Water / Sewer

$3,532,604.00

Public - State/Provincial

Site Work

108

36

14

7

Subscribe For Documents

89 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Multiple Contract Summary, Work Sequence, Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Reinforcing Steel, Welded Wire Fabric Reinforcing, Cast-in-Place Concrete, Architectural Concrete, Concrete Finishing, Precast Concrete
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Fabrications, Metal Railings
Division 08 - Openings

Division 08 - Openings

Hardware, Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Panel Signage
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Rugs and Mats, Runners, Furniture, Seating, Chairs, Residential Furniture, Beds
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Scaffolding
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings
Division 27 - Communications

Division 27 - Communications

Audio-Video Communications, Audio-Video Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Excavation and Fill, Excavation, Fill, Backfill, Compaction, Shoring and Underpinning, Concrete Raising, Pressure Grouting
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Concrete Overlays, Operation and Maintenance of Planting, Bases, Ballasts, and Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings, Planting
Division 33 - Utilities

Division 33 - Utilities

Storm Drainage Utilities, Culverts
Division 34 - Transportation

Division 34 - Transportation

Transportation Signaling and Control Equipment, Roadway Signaling and Control Equipment, Traffic Signals
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists, Cranes, Tower Cranes, Derricks, Manufacturing Equipment, Machining Equipment, Grinding Equipment, Finishing Equipment, Grinding Equipment

Find More Local Projects

Within 75 Miles of This Project
455
Active Projects
236
Bidding Soon
5,146
All Active Projects
2,263
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 28, 2025

July 28, 2025

img_map_placeholder

Multiple Locations, Jersey City, NJ


Find. Bid. Win. Your Next Project Starts Here.

Get the right
data with Project Intelligence

Share with your network.

World Trade Center Flood Mitigation and Resiliency Improvements

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.