Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published April 23, 2025 at 8:00 PM
Updated October 1, 2024
Site work, paving, outdoor lighting, new construction and renovation of a mixed-use development in Wheaton, Illinois. Completed plans call for the construction of a 122,902-square-foot playground / park / athletic field.
BID NOTICESealed bids will be received at the Forest Preserve District of DuPage County,3S580 Naperville Rd., Wheaton IL 60189 until Tuesday, April 22, 2025 at 1:30 P.M.for the following:Project Name: Grounds and Natural Resources Management Maintenance Campus atBlackwell Forest PreserveProject Number: Z-021-030Project overview: The work to be done for this project, shown on the Drawingsentitled, “Grounds and Natural Resources Management Maintenance Campus,â€prepared by Woodhouse Tinucci Architects dated March 17, 2025, consists ofconstructing four new structures and associated site work that create the Groundsand Natural Resources Management Maintenance Campus. The four structures includethe main GNR Building (112,900 SF), the Nursery Workshop and Greenhouse (5,300 SF),atrailer canopy, and renovations to an existing wash bay (4,700 SF). Majorbuilding components include pre-engineered steel building enclosure, concrete,masonry,carpentry, mechanical, plumbing, and electrical work including a PVsystem. Site work includes concrete and asphalt paving, site lighting, undergroundutilities including water main and sanitary sewer, excavation, and generallandscape. This work shall be bid as two bid packages. The bidder may bid on one orboth of the bid packages.Bid specifications, and bid forms may be obtained via District website athttps://www.dupageforest.org/about/bids-proposals or via DemandStar athttps://www.demandstar.comQuestions shall be directed to Jon Melin at jmelin@dupageforest.orgThe bids must be accompanied by a 10% bid security.The Project Manager’s estimate is $40,000,000 including both bid packages and allalternates.All bids must be received prior to the date and time shown above. No late bids willbe accepted.This project is being financed, in part, with funds from the Illinois Department ofCommerce & Economic Opportunity (DCEO).This project is subject to the Illinois Prevailing Wage Act, 820 ILCS 130/0.01 etseq. The contractor shall also abide by the employment of Illinois Workers onPublic Works Act (30 ILCS 570, sec 1-7).A non-mandatory pre-bid meeting for general contractors will be held in person atthe District’s Headquarters at 3S580 Naperville Road, Wheaton, IL 60189 at 1:30PM on Monday, March 24, 2025.Consideration of contract award will likely be made on Tuesday, May 20, 2025.Minority business firms are encouraged to submit bids on the project and successfulcontract bidders are encouraged to utilize minority businesses as subcontractorsfor supplies, equipment, services and construction.Bid package #2 has a Business Enterprise Program Goal assigned by the DCEO in orderto comply with the Business Enterprise for Minorities, Females and Persons withDisabilities Act (30 ILCS 575/0.01 et seq.)The Forest Preserve Commission reserves the right to reject any or all bids and towaive technicalities.FOREST PRESERVE DISTRICT OF DUPAGE COUNTYP.O.BOX 5000Wheaton, IL 60189-5000(630) 933-7200Published in Daily Herald March 17, 2025 (283366), posted 03/17/2025
Post-Bid
Playgrounds / Parks / Athletic Fields
$45,000,000.00
Public - County
New Construction, Outdoor Lighting, Paving, Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Division 01 - General Requirements
Division 02 - Existing Conditions
Division 03 - Concrete
Division 04 - Masonry
Division 05 - Metals
Division 06 - Wood, Plastics, and Composites
Division 07 - Thermal and Moisture Protection
Division 08 - Openings
Division 09 - Finishes
Division 10 - Specialties
Division 11 - Equipment
Division 12 - Furnishings
Division 13 - Special Construction
Division 14 - Conveying Equipment
Division 21 - Fire Suppression
Division 22 - Plumbing
Division 23 - Heating Ventilating and Air Conditioning
Division 26 - Electrical
Division 27 - Communications
Division 28 - Electronic Safety and Security
Division 31 - Earthwork
Division 32 - Exterior Improvements
Division 33 - Utilities
Division 40 - Process Interconnections
Division 41 - Material Processing and Handling Equipment
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment
Division 44 - Pollution Control Equipment
Division 48 - Electrical Power Generation
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 22, 2025
June 9, 2025
Butterfield Rd, Wheaton, IL
Related To This Project
Wheaton, IL
Bid Date: Mar 27 2025
Wheaton, IL
Bid Date: Mar 31 2025
Wheaton, IL
Bid Date: Apr 04 2025
Wheaton, IL
Bid Date: Apr 03 2025
Wheaton, IL
Bid Date: Apr 03 2025
Wheaton, IL
Bid Date: Apr 09 2025
Wheaton, IL
Bid Date: Apr 03 2025
Wheaton, IL
Bid Date: Apr 25 2025
Wheaton, IL
Bid Date: Mar 26 2025
Wheaton, IL
--
Wheaton, IL
Bid Date: Mar 18 2025
Wheaton, IL
Bid Date: Mar 20 2025
Wheaton, IL
Bid Date: Mar 13 2025
Wheaton, IL
Bid Date: Mar 11 2025
Wheaton, IL
Bid Date: Mar 12 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
.webp)
Get the right
data with Project Intelligence
Share with your network.
Grounds and Natural Resources Management Maintenance Campus at Blackwell Forest Preserve
Project Shared
with
example@example.com
.webp)
Upgrade now for industry‑leading commercial construction data.
You've reached the free-view limit.
Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.