BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 5, 2025 at 8:00 PM

Updated May 6, 2025

Site work and paving for a mixed-use development in Manchester, Connecticut. Completed plans call for site work for a playground / park / athletic field; sidewalk / parking lot; for paving for a sidewalk / parking lot; road / highway; and road / highway.

Work under this contract includes replacement of the existing Laurel Marsh Parking Lot, located at 864 Middle Tpke W (U.S. Route 6 & 44) in the Town of Manchester, and installation of a new, Hockanum River Trail mid-block pedestrian & cyclist crossing adjacent to the parking area. It includes appurtenant work such as removal of the existing asphalt parking lot and fine grading, new driveway aprons, removal and replacement of timber barrier fencing, extruded concrete curbing, installation of a bioswale and infiltration trench for collection of parking area runoff, ADA accessibility improvements including ADA concrete ramps and minor sidewalk repair, modification of the roadway median, installation of pedestal mounted solar powered Rectangular Rapid Flashing Beacons (RRFBs), epoxy resin pavement markings & symbols, installation of roadway signs, minor clearing & grubbing, surface restoration, and traffic control. Question Deadline 04/01/2025 at 11:30 PM ET Question Response Deadline: April 2, 2025, 7:00pm. Every request for such interpretation should be submitted via electronically. The Project Schedule for this project is projected to be completed within THIRTY (30) WORKING DAYS (contract days). Each bid must be accompanied by a bid bond or bank check, payable to the Town of Manchester for five percent (5%) of the total bid. In the event of a base bid/alternate bid situation, the bid bond will be for five percent (5%) of the base bid. The bond must be furnished by a surety company satisfactory to the Town and must be a corporate surety licensed to sign surety bonds in the State of Connecticut. The Town of Manchester will not be liable for the accrual of any interest on any certified check submitted. Cashiers' checks made payable to the Town of Manchester will be accepted. The Performance Bond and the Labor and Materials Bond shall be equal to one hundred percent (100%) of the contract price and shall be furnished within ten (10) business days of the Notice of Award or prior to the start of Work, whichever comes first. The surety on such bond or bonds shall be a duly authorized surety company qualified to do business under the laws of the State of Connecticut and satisfactory to the Town. The Town reserves the right to reject any and all bids, to waive technical defects and to make such awards including accepting a bid, although not the low bid, as it deems in its sole discretion to be in the best interest of the Town. The Town reserves the right to reject any bid if the Bidder, any officer of the Bidder, or any other company owned in whole or in part by an officer(s) of the Bidder, is delinquent in the payment of any taxes or fees owed to the Town. The Town reserves the right to require a disclosure statement from the Bidder listing the name(s) of all officers of the company.

Award

Sidewalks / Parking Lot

$309,680.00

Public - City

Paving, Site Work

24

8

3

4

Subscribe For Documents

54 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
842
Active Projects
163
Bidding Soon
6,777
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 7, 2025

June 6, 2025

Project location map

864 Middle Turnpike W, Manchester, CT

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.