Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published October 6, 2025 at 8:00 PM
Updated October 7, 2025
Site work, paving and new construction of a mixed-use development in Minot AFB, North Dakota. Conceptual plans call for site work for a road / highway; for paving for a road / highway; water / sewer project; for the construction of a 2,600-square-foot pre-engineered storage facility; and pre-engineered storage facility.
The U.S. Army Corps of Engineers, Omaha District is conducting market research to identify sources (Small Businesses and Other-than-Small Businesses) that have the knowledge, skills and capability to perform the work concerning the potential project(s) described below. Responses are requested only from: POTENTIAL PRIME CONSTRUCTION CONTRACTORS WITH COMPANY BONDING CAPABILITY (SINGLE JOB) OF AT LEAST $5M. The responses to this source sought announcement will be used by the Government to make appropriate acquisition decisions for this project. Questions or concerns surrounding small business matters can be sent to cenwosb@usace.army.mil. Please include the Sources Sought Notice Identification Number in the Subject line of any email submission. Magnitude of Construction: Disclosure of the magnitude of construction, as prescribed in FAR 36.204 and DFARS 236.204, is between $1M and $5M. Project is a FSRM project and will primarily be funded with Air Force Operation & Maintenance (O&M) dollars. Project Location and Description: Minot AFB, ND This upcoming solicitation will be executed using a design-build (DBB) project delivery method, which will require the contractor to provide the Government with a complete facility and warranty based on the Request for Proposal (RFP). Requirement includes work components at the Missile Handling Team (MHT) Complex on Minot Air Force Base (MAFB), North Dakota (ND): Project will construct a new approximately 2,600 SF pre-engineered metal building that will serve as a heated vehicle storage facility. Structure will consist of strip footings, factory finished and insulated metal wall panels, and standing metal seam roof. Installation of electrical, communication, gas, water, and sewer utility connections, along with NIPR and SIPR communications systems may be required. Associated site features and paving will also be required. Facility will be designed as permanent construction in accordance with the DoD Unified Facilities Criteria (UFC) 1-200-01, General Building Requirements and UFC 1-200-02, High Performance and Sustainable Building Requirements. Each facility must be compatible with applicable DoD, Air Force, aircraft, and base design standards. In addition, sustainable and maintainable construction materials and techniques shall be used where cost effective and/or where specified. This project will comply with Department of Defense Antiterrorism/Force Protection requirements per Unified Facilities Criteria 4-010-01 (as applicable). Special construction and functional requirements: Facility will require the establishment of a freezone through the use of temporary fencing to separate this project's site with the wider MHT Complex. Project Period of Performance: Approximately 390 calendar days from construction NTP but may vary depending on individual component of work. As of October 6, 2025, an issuance of short-listed firms has not been released. A design build firm has not been disclosed. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Conceptual
Warehouse / Distribution - Pre-Engineered Storage Building
$5,000,000.00
Public - Federal
New Construction, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 20, 2026
To Be Determined, Minot AFB, ND
Related To This Project
Minot AFB, ND
Bid Date: Apr 10 2025
Minot AFB, ND
Bid Date: May 08 2025
Minot AFB, ND
Bid Date: Nov 20 2025
Minot AFB, ND
Bid Date: Oct 30 2025
Minot AFB, ND
Bid Date: Oct 21 2025
Minot AFB, ND
Bid Date: Dec 18 2025
Minot AFB, ND
Bid Date: Dec 18 2025
Minot AFB, ND
Bid Date: Jan 10 2026
Minot AFB, ND
--
Minot AFB, ND
Bid Date: Dec 11 2024
Minot AFB, ND
Bid Date: Oct 28 2024
Minot AFB, ND
Bid Date: Jul 15 2024
Minot AFB, ND
Bid Date: Aug 14 2024
Minot AFB, ND
Bid Date: Aug 14 2024
Minot AFB, ND
--
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.
