BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 3, 2025 at 8:00 PM

Updated June 4, 2025

Site work and paving for a civil project in Baldwin, Michigan. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

In cooperation with the Lake County Road Commission the project includes the removal of three existing culverts at the E. 24th Street crossing over the North Branch of Cole Creek and construction of a new Timber Bridge. The project is located northwest of Baldwin, Michigan east of the intersection of E. 24th Street and S. Broadway Street. The contractor would be responsible for installing and removing temporary cofferdams, installation of timber piles for a timber bridge, construction of abutments and wingwalls for a timber bridge, construction of the proposed stream channel, construction of bridge approach road sections, construction of guardrail, and final slope restoration work. Lake County Road Commission will provide traffic control, removal of existing culverts, earth excavation, structure backfill, and installation of the prefabricated timber bridge.\ Question Deadline 04/04/2025 at 3:00 PM ET All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing via email only to Project Manager, Shane Brennan shane.brennan@spicergroup.com.

Award

Bridges / Tunnels

$375,950.00

Public - County

Paving, Site Work

14

11

4

8

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
102
Active Projects
56
Bidding Soon
642
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 10, 2025

May 12, 2025

Project location map

Multiple Locations, Baldwin, MI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.