Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 8, 2025 at 8:00 PM
Updated July 9, 2025
This is a service / maintenance or supply contract in Buckeye, Arizona. Contact the soliciting agency for additional information.
Written Inquiries Due Date March 28, 2025, 11:00am To request a reasonable accommodation or alternative format for any public meeting, please contact the Procurement Officer (Alexandro Salazar) at (602) 495-7231/Voice or 711/TTY, or alexandro.salazar@phoenix.gov, no later than two (2) weeks prior to the meeting. The contractor will be required to manage and operate the water utility system include well sites and a reverse osmosis system at the SR 85 Landfill located in the City of Buckeye. This includes monitoring, sampling and reporting to maintain compliance with local, county, state and federal environmental regulations. The City reserves the right to change dates, times, and locations, as necessary. All times are Phoenix local time. The City does not always hold a Pre-Offer Conference or Site Visit. The City of Phoenix invites sealed offers for The landfill site consists of 2,652 acres of land which is currently owned by the City of Phoenix. The site is located west of SR 85 and south of Patterson Road about halfway between the City of Buckeye and Town of Gila Bend. for a three year term, with two option years commencing on or about July 1, 2025, in accordance with the specifications and provisions contained herein or the "Effective Date" which is upon award by City Council, conditioned upon signature and recording by the City Clerk's department, as required by the Phoenix City Code, whichever is later. 3.8. Liquidated Damages The Operator will pay liquidated damages in the amount of one hundred dollars ($100.00) per day for late submission of each report. These reports are time sensitive due to county, state, and federal regulations and reporting guidelines. The Operator will pay liquidated damages in the amount of one hundred dollars ($100.00) per day for late submission of each water sample. These samples are time sensitive due to county, state, and federal regulations and reporting guidelines. The Operator will also be liable for any penalty(ies) assessed City by county, state, or federal agencies due to late reporting of the City's reporting deadlines.
Post-Bid
Water / Sewer
Public - City
Service, Maintenance and Supply
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 2, 2025
July 1, 2025
State Rd 85 N, Buckeye, AZ
Related To This Project
Buckeye, AZ
Bid Date: Apr 15 2025
Buckeye, AZ
--
Buckeye, AZ
--
Buckeye, AZ
Bid Date: Apr 11 2025
Buckeye, AZ
--
Buckeye, AZ
Bid Date: Apr 25 2025
Buckeye, AZ
--
Buckeye, AZ
--
Buckeye, AZ
--
Buckeye, AZ
Bid Date: Apr 16 2025
Buckeye, AZ
Bid Date: Apr 09 2025
Buckeye, AZ
Bid Date: Mar 27 2025
Buckeye, AZ
Bid Date: Apr 04 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
