BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 9, 2025 at 8:00 PM

Updated May 10, 2025

Site work for a water / sewer project in Buckeye, Arizona. Completed plans call for site work for a water / sewer project.

The nature of the Work to be performed under this project shall consist of furnishing all labor, materials and equipment required to construct the facilities and features called for by plans and specifications, and the contract documents. The type, purpose and location of the proposed project are generally described below and in more detail in the plans and specifications. SUN CITY FESTIVAL PARCEL 33 INFRASTRUCTURE â POTABLE WATER LINES ("the project") includes the installation of approximately 3,064 lineal feet of 16" potable water line improvements, 8 stubs to new fire hydrants, 1, 12" water stub, 3, 8" water stubs, and associated facilities within the City of Buckeye as shown on the construction plans, as noted in the bid schedule, and as noted in the bid specifications. This project includes the furnishing of all materials, labor, equipment, tools, transportation, traffic control, and services required for the installation of potable water line, and the necessary City of Buckeye requirements for final acceptance. Each proposal shall be accompanied by a certified check, cashier's check or surety bond for ten percent of the amount of the bid included in the proposal as a guarantee that the contractor will enter into a contract to perform the project in accordance with the plans and specifications. Notwithstanding the provisions of any other statute, the surety bond shall be executed solely by a surety company or companies holding a certificate of authority to transact surety business in this state issued by the director of the department of insurance pursuant to title 20, chapter 2, article 1. The surety bond shall not be executed by an individual surety or sureties, even if the requirements of Â7 101 are satisfied. The certified check, cashier's check or surety bond shall be returned to the contractors whose proposals are not accepted, and to the successful contractor upon the execution of a satisfactory bond and contract as provided in this article. By submitting a bid for this project, the bidder acknowledges that they have, at a minimum met the requirements set forth in the Invitation to Bid, including but not limited to, PulteGroup Insurance Requirements, Scope of Work, General Specifications, etc. Developer reserves the right to reject any or all proposals and/or withhold the award for any reason. Developer also reserves the right to waive any informality related to this solicitation in Developer's sole discretion and reserves the right to reject any and all proposals and resolicit and/or cancel this solicitation.

Post-Bid

Water / Sewer

$200,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
101
Active Projects
50
Bidding Soon
1,208
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.