BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 21, 2025 at 8:00 PM

Updated April 22, 2025

Site work and paving for a civil project in Buckeye, Arizona. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

SUN CITY FESTIVAL PARCEL AA1 PHASE 1&2 PAVING (“the project”) includes the installation of PAVING roadway and drainage improvements, and associated facilities within the City of Buckeye as shown on the construction plans, as noted in the bid schedule, and as noted in the bid specifications. This project includes the furnishing of all materials, labor, equipment, tools, transportation, traffic control, and services required for the installation of the reclaimed and potable water lines, and the necessary City of Buckeye requirements for final acceptance.

Post-Bid

Roads / Highways

$2,300,000.00

Public - City

Paving, Site Work

89

8

2

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
101
Active Projects
50
Bidding Soon
1,208
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.