BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 28, 2025 at 8:00 PM

Updated December 2, 2025

Demolition, site work, paving, renovation and addition to a mixed-use development in West Tisbury, Massachusetts. Completed plans call for the addition of a 15,000-square-foot, one-story above grade transportation facility; for the demolition of a transportation facility; for the renovation of a 5,000-square-foot transportation facility; for site work for a transportation facility; for paving for a transportation facility; and water / sewer project.

The airport seeks to renovate portions of the existing terminal (approximately 5,000 sf.) and construct (approximately 15,000 sf), addition to the Terminal. This project will address deficiency within the existing building to include but not be limited to construction of a new secured (post TSA screening) waiting area for passengers who are awaiting departing aircraft, constructing a new TSA passenger queuing and screening area, construction of new arrivals hall, and baggage claim area. Relocation and Improvements to the checked baggage inspection area, new rental car area, new ticketing counters, new HVAC systems, new electrical and electrical service, new standby generator, fire suppression system, low voltage access control, security cameras and public address systems, and other work. Building construction includes a single-story addition totaling approximately 15,000 sf. Work includes concrete foundation, slab on grade, framing, water proofing, aluminum glazed openings, asphalt shingle pitched roofing and cedar wood shingles. Sitework includes utilities, paving, sidewalk, parking lot lighting, landscaping, and other work. Question Deadline 06/19/2025 at 4:00 PM ET Questions from General Contractors are due All questions should be emailed to Annalisa Lewis at alewis@chasolutions.com and Prajakta Patil at ppatil@chasolutions.com The work is estimated to cost $35,000,000 with no alternative.

Award

Transportation Terminals

$34,800,000.00

Public - County

Addition, Demolition, Paving, Renovation, Site Work

231

30

362

6

Subscribe For Documents

62 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
105
Active Projects
3
Bidding Soon
1,457
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 25, 2025

August 25, 2025

Project location map

71 Airport Rd, West Tisbury, MA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.