BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 7, 2025 at 8:00 PM

Updated April 8, 2025

Site work and paving for a sidewalk / parking lot in Saint Louis, Missouri. Working plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

The 131st Mission Support Group contracting office intends to issue an Invitation for Bids to award a single firm fixed-price contract for services, non-personal, to provide all plant, labor, transportation, materials, tools, equipment, appliances, and supervision necessary for the construction of vehicle operations covered parking. The contract duration will be 260 calendar days after notice to proceed to include inspection and punch list. The project is set aside 100% for small businesses. The North American Industry Classification System (NAICS) code is 236220, with a small business size standard of $45 million. The magnitude of construction is between $1,000,000 and $5,000,000.Options will include (1) add waterproof electrical receptacles (shown as "Alternate 2 on the drawings) and (2) add gutters and downspouts (shown as "Alternate 4" on the drawings). Alternates 1 and 3 are not anticipated to be used. The tentative date for issuing the solicitation is on-or-about 30 May 2025 with a pre-bid conference and site visit approximately two weeks later. The date, time, location and how to register will be included in the solicitation. Interested contractors are encouraged to attend and shall follow conference registration and base access requirements shown in the solicitation. A site visit will follow the pre-bid conference. The bid opening is tentatively planned for approximately 30 days following solicitation release. Actual dates and times will be identified in the solicitation. Interested offerors must be registered in the System for Award Management (SAM). Instructions to register are on SAM.gov and there is no fee for registration. Your attention is directed to FAR clause 52.219-14(e)(3) (DEVIATION 2021-O0008), LIMITATIONS ON SUBCONTRACTING, which states "By submission of an offer and execution of a contract, the Offeror/Contractor agrees in performance of the contract for General construction, it will not pay more than 85 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count toward the prime contractor's 85 percent subcontract amount that cannot be exceeded." In accordance with FAR 36.211(b), the following information is provided: (1) The National Guard has no agency-specific policies or procedures applicable to definitization of equitable adjustments for change orders under construction contracts other than those described at FAR 43.204, DFARS 243.204, and AFARS 5143.204. (2) Data for the prior 3 fiscal years regarding the time required to definitize equitable adjustments for change orders under construction contracts for the National Guard is currently not available, but will be compiled and provided in future announcements. DISCLAIMER: The official plans and specifications are located on the official Government webpage and the Government is not liable for information furnished by any other source. If you are reading this notice on a website other than SAM.gov, you are not viewing the official Government notice and may be missing information. The solicitation and any amendments will be posted to SAM.gov for electronic downloading. This will be the only method of distributing amendments prior to closing; therefore, it is the offeror's responsibility to check the website periodically for any amendments to the solicitation. Websites are occasionally inaccessible. The Government is not responsible for any loss of Internet connectivity or for an offeror's inability to access the documents posted on the referenced web pages. The Government will not issue paper copies of any solicitation document. The Method of Contractor Selection has not been determined at this Time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Final Planning

Sidewalks / Parking Lot

$5,000,000.00

Public - Federal

Paving, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
267
Active Projects
129
Bidding Soon
1,377
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 30, 2025

Project location map

To Be Determined, Saint Louis, MO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.