BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 28, 2025 at 7:00 PM

Updated December 2, 2025

Site work and renovation of a civil project in Warwick, Oklahoma. Completed plans call for site work for a water / sewer project; and for the renovation of a water / sewer project.

Construction of a Potable Booster Pump Station and Amr Water Meters As Such, Compliance With Labor Standards Contract Provisions is Mandatory. Compliance With the Davis Bacon Act is Mandatory if the Total Project Cost Exceeds $10,000,000 (Ten Million Dollars). Each Bidder Shall Accompany His Original Hid, Filed With the Owner With a Certified or Cashier's Check on a Solvent Bank Located in Oklahoma, or a Bidder's Bond, in the Amount of Five (5) Percent of the Amount Bid, as a Guarantee of His Ability to Perform the Contract Bid Upon, and That He Will Enter Into a Written Contract With the Owner to Perform Said Work and/or Furnish Said Materials in Accordance With Said Plans and Specifica-tions, and Furnish the Required Bonds According to the Public Competitive Bidding Act of 1974. The Owner Will Retain the Deposit for Liquidated Damages in Case the Successful Bidder Fails to Enter in Said Contract and Furnish the Required Bonds Provided for in the Specifications Within the Time Required. Deposit of the Unsuccessful Bidders Will He Returned Upon the Execution of the Contract and Required Bonds. If the Total Project Cost Exceeds $10,000,000 (Ten Million Dollars) Davis Bacon Act Wage Rules Shall Apply. This Project is to Be Financed by the Arpa Grant Program Managed by the Oklahoma Water Resources Board (Owrb) and Shall Be Referred to Project No. Arp-23 0037-dpg. Construction, Maintenance and Statutory Payment Bonds in the Amount of 100% of the Contract Price Are Required for This Project. These Bonds Must Be Obtained From a Corporate Surety Licensed in Oklahoma and Approved by the Owner and Consulting Engineer, the Bidder Shall State in the Proposal the Name and Address of the Surety or Sureties Who Will Sign This Bond in Case the Contract is Awarded. The Maintenance Bond Required Will Guarantee the Repair of All Damage Due to Improper Materials or Workmanship for a Period of One (1) Year After the Acceptance of the Work by the Owner. Each Hidder Shall Accompany His Original Hid, Filed With the Owner With a Certified or Cashier's Check on a Solvent Bank Located in Oklaho Ma, or a Bidder's Bond, in the Amount of Five (5) Percent of the Amount Bid, as a Guarantee of His Ability to Perform the Contract Bid Upon, and That He Will Enter Into a Written Contract With the Owner to Perform Said Work and/or Furnish Said Materials in Accordance With Said Plans and Specifica-tions, and Furnish the Required Bonds According to the Public Competitive Bidding Act of 1974 Funding for This Project is Provided Through American Rescue Plan Act (Arpa) Grant Program. As Such, Compliance With Labor Standards Contract Provisions is Mandatory. Compliance With the Davis Bacon Act is Mandatory if the Total Project Cost Exceeds $10,000,000 (Ten Million Dollars).

GC Bidding

Water / Sewer

$1,000,000.00

Public - County

Renovation, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
167
Active Projects
99
Bidding Soon
1,177
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 18, 2025

January 19, 2026

Project location map

To Be Determined, Warwick, OK

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.