BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 6, 2025 at 8:00 PM

Updated May 7, 2025

Renovation of a municipal facility in Saint George, South Carolina. Completed plans call for the renovation of a municipal facility.

Each bid must be accompanied by a bid bond acceptable to the County. Bid bonds must be issued by a corporate surety registered and authorized to do business in the State of South Carolina. Bid bonds shall be payable to the County, shall be for at least five (5%) percent of the total amount of the bid and shall serve as a guarantee deposit that the bid will be carried out to the complete satisfaction of the County. The successful Bidder shall provide performance and payment bonds, in a form satisfactory to the County, in the following amounts: Payment Bond: 100% of the total amount of the Contract. Performance Bond: 100% of the total amount of the Contract. The last day and time for submittal of written questions shall be no later than Friday, April 4, 2025, at 5:00 PM Eastern Standard Time. Dorchester County is seeking bids from qualified and experienced Contractors to provide repairs to the stucco wall at the Courthouse. The project will consist of repairing the stucco wall surrounding secure areas at the Courthouse. Work shall include the furnishing of all labor, materials, equipment, and services, incidental and implied, for the completion of work as described herein. All items not specifically mentioned in the specifications, but which obviously are required to make the job complete, shall be included in the bid. Quantities and conditions should be verified prior to bid during the mandatory pre-bid conference at the site. 1. Contractor to remove and discard stucco material with any cracks, holes crumbling or peeling areas found along with the metal flashing cap that was previously installed and seal holes. 2. Contractor to pressure wash, sandblast, or wire brush to remove any contaminants from block/concrete wall surface. 3. Contractor will repair any cracks, holes crumbling or peeling areas found in the block/concrete wall surface. 4. Contractor will seal top sandstone with clear sealer to be approved by county representative. 5. Contractor is responsible for daily cleanup and disposal of any materials. 6. Contractor to provide and maintain dumpster throughout the project 7. Contractor is responsible for material approval by county representative.

Bid Results

Municipal

$81,752.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

4

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
182
Active Projects
106
Bidding Soon
1,049
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 15, 2025

May 15, 2025

Project location map

5200 E Jim Bilton Blvd, Saint George, SC

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.