BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 25, 2025 at 8:00 PM

Updated June 26, 2025

Renovation of a communication facility in Fredonia, New York. Working plans call for the renovation of a communication facility.

The deadline to submit questions is 11:00 AM Monday, March 31, 2025 The Rockefeller Arts Center is home to the Visual and Performing Arts Program. The Rockefeller Arts Center, constructed in 1969, is a 176,216 GSF five-story building that was last renovated in 1996. The Project will replace mechanical equipment that has exceeded its useful life and provide airflow to occupied areas within the building. The Project will provide replacement of all air handling units as well as limited upgrades to electrical and ductwork systems. Interior finishes will be replaced to accommodate the installation of new ductwork. The Project includes the removal of hazardous materials and will provide upgrades to meet current code and ADA requirements. Submissions should emphasize the firm's significant past experience in providing construction phase CM services for public institutions and institutional clients in a complete and expeditious manner. The current estimated construction budget is approximately $13,918,000 Contract term: 36 Months Minority Owned Sub-Contracting Goal: 10% Women Owned Sub-Contracting Goal: 10% Service-Disabled Veteran-Owned Business Contracting Goal: 3% SOQs must be submitted in the format prescribed by the Fund using the link provided in the email received after registration that supplies the RFQ. Required electronic copies of Statements of Qualifications (SOQs) must be received by the due date and time specified in the RFQ. Paper or emailed copies of SOQs will not be accepted. In accordance with State Finance Law 139-j and 139-k, all inquiries regarding this procurement can only be made to: Samantha Lord Jeremy Clausi Kelly Whitbeck Doreen Bottieri Scott Clay, Joanne Lovelady and/or Joseph Francis (M/WBE SDVOB Issues Only) * Please be advised, the State University Construction Fund (the Fund) has elected to cancel the Construction Management as Agent services procurement for the project referenced above.*

Final Planning

Communication

$13,918,000.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

4

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
288
Active Projects
166
Bidding Soon
2,208
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 11, 2025

September 28, 2026

Project location map

280 Central Ave, Fredonia, NY

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.