BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 25, 2025 at 8:00 PM

Updated September 26, 2025

Site work and paving for a mixed-use development in Springdale, Arkansas. Working plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

As of September 25, 2025, the owner is signing award documents and preparing for construction. A construction manager has been selected. Construction is expected to start in the first quarter of 2026. *The closed solicitation has been included below for reference: The City of Springdale Department of Engineering of Springdale, Arkansas ("Owner") is accepting Statements of Qualifications (SOQ) from qualified construction management firms licensed by the Arkansas Contractors Licensing Board interested in acting as the construction manager at-risk (CMAR) contractor ("CMAR Contractor") for the Sunset Avenue and Powell Street Improvements Project (the "Project"). CMAR Contractor will provide pre-construction services pursuant to the scope of services set forth in Exhibit 1 - Preconstruction Services Scope of Work The scope of work for construction services includes: widening of Sunset Avenue for approximately 0.23 miles from Shipley Street to Turner Street (including a three lane roadway section, on street parking, new curb and gutter, enclosed drainage system, access control improvements, and sidewalk/sidepath construction), intersection improvements (two, single lane roundabouts) at the Sunset/Holcomb/Turner intersection, the extension of Sunset Avenue along a new alignment for approximately 0.38 miles from Turner Street to Powell Street (including a three lane roadway section, curb and gutter, enclosed drainage system, and sidewalks/sidepaths), new intersection (single lane roundabout) at Sunset and Powell Street, the widening of Powell Street to a three lane roadway section for approximately 0.67 miles from Charles Avenue to Woodridge Drive, intersection and signal improvements at the Powell Street and E. Robinson Avenue intersection, and a grade separated (tunnel) Razorback Greenway trail crossing of Robinson Avenue. Interview of Shortlisted Firms May 6, 2025 Notification of Selection May 20, 2025 Anticipated Execution of Agreement for Preconstruction Services June 20, 2025 Anticipated Execution of GMP Amendment TBD - will be determined during preconstruction Construction is expected to begin by January 31st, 2026 with final commissioning completed by July 31st, 2027. In lieu of attending the meeting in person, prospective Respondents may attend virtually. If Respondent prefers to attend virtually, please make such request via email to Ben Peters at bpeters@springdalear.gov, and a meeting invitation will be provided. The meeting will be held at the date and time identified in the procurement schedule. After the meeting, an escorted visit to the proposed site will be conducted for all meeting attendees. Attendance at this conference (virtual or inperson) is MANDATORY. Owner will accept any questions about the project from prospective Respondents in writing until the question submission deadline. Respondents shall use Form A - RFC to submit questions. Respondents shall submit questions via email to Ben Peters at bpeters@springdalear.gov. Question Submission Deadline April 14, 2025

Pre-Construction/Negotiated

Roads / Highways

$1,000,000.00

Public - City

Paving, Site Work

284

5

2

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
138
Active Projects
73
Bidding Soon
871
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 22, 2025

February 15, 2026

Project location map

Multiple Locations, Springdale, AR


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.