Site work for a water / sewer project in Elgin, Illinois. Completed plans call for site work for a water / sewer project.

The scope of work consists of the installation of approximately 9,325 feet of 8-inch water main, approximately 270 feet of 6-inch water main, approximately 298 full lead service line replacements from water main to interior water meter, and all other appurtenant work and materials necessary to complete the project throughout the City of Elgin as set forth in the bid documents. The successful bidder shall be required to furnish a satisfactory contract bond to the City of Elgin by a surety company authorized to do business in the State of Illinois covering the full amount of the contract. The successful bidder and all sub-contractors shall be required to conform to the labor standards set forth in the Contract Documents. The successful bidder shall pay prevailing wage and shall provide certified payrolls to the City for the duration of the project. This project must comply with the Elgin Responsible Bidders Ordinance and the Illinois Works Jobs Program Act (Apprenticeship Initiative) [30 ILCS 559/20/20-1]. Any contract or contracts awarded under this invitation for bids are expected to be funded in part by a loan from the Illinois Environmental Protection Agency (Illinois EPA). Neither the State of Illinois nor any of its departments, agencies, or employees is or will be a party to this invitation for bids or any resulting contract. The procurement will be subject to regulations contained in the Procedures for Issuing Loans from the Public Water Supply Loan Program (35IAC Part 662), the Davis-Bacon Act (40 USC 276a through 276a-5) as defined by the United States Department of Labor, the Employment of Illinois Workers on Public Works Act (30 ILCS 570), Illinois Works Jobs Program Act (30 ILCS 559/20-1), and the federal "Build America, Buy America Act" requirements contained in the Infrastructure Investment and Jobs Act, Pub. L. No. 117-58. This procurement is also subject to the loan recipient's policy regarding the increased use of disadvantaged business enterprises. The loan recipient's policy requires all bidders to undertake specified affirmative efforts at least sixteen (16) days prior to bid opening. The policy is contained in the specifications. Bidders are also required to comply with the President's Executive Order No. 11246, as amended. The requirements for bidders and contractors under this order are explained in 41 CFR 60-4. The bidder shall submit, if requested by the City, a list of qualified references for projects of similar size and scope of this project. Proposals withdrawn may not be resubmitted at the same letting. Each bidder shall satisfy the City as to their ability, financially or otherwise, to carry out the work. The right is reserved to reject any or all bids or to waive technicalities and any informality in any bid. Questions regarding the bidding process or bidding software can be directed to Nick Etminan, Purchasing Officer at (847) 931-5606 or nickon.etminan@elginil.gov. Questions regarding this bid package can be directed to Timo Bello, Utilities Superintendent, by email at timo.bello@elginil.gov. Technical questions regarding the scope of work should be addressed to Julie Morrison at Engineering Enterprises, Inc. at jmorrison@eeiweb.com no later than May 1, 2025, at 4:00 pm.

GC Bidding

Water / Sewer

$1,604,000.00

Public - City

Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Closeout Submittals, Warranties
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Facility Remediation, Asbestos Remediation
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Stone Assemblies
Division 09 - Finishes

Division 09 - Finishes

Tiling
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Storage Specialties, Lockers
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Lifts
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Air Distribution, HVAC Ducts and Casings
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Excavation and Fill, Excavation, Dewatering, Backfill, Compaction
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Pruning, Bases, Ballasts, and Paving, Unit Paving, Curbs and Gutters, Paving Specialties, Pavement Markings, Planting, Turf and Grasses, Seeding, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Lifts

Find More Local Projects

Within 75 Miles of This Project
239
Active Projects
157
Bidding Soon
2,694
All Active Projects
1,169
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 7, 2025

July 7, 2025

img_map_placeholder

Multiple Locations, Elgin, IL

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Year 4 Lead Service Line Replacement Program - Contract A

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.