BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 25, 2025 at 8:00 PM

Updated April 26, 2025

Site work and paving for a road / highway in Albany, California. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Project consists of pavement repair on City arterial Buchanan Street at the section located between Pierce Street and Jackson Street and the arterial Marin Avenue between Jackson Street and San Pablo Avenue. Pavement repair generally consists approximately 2,700 square yards of 4-inch asphalt concrete pavement removal and replacement. Traffic striping within project limits will be refreshed, including traffic striping unaffected by the pavement repair. Additional pavement repair at a nearby location on Eastshore Highway between the driveway entrance to the Target shopping center and the driveway entrance to the Toyota of Berkeley Service Center is included as optional Bid Alternate A. This Project requires a valid California contractor's license for the following classification(s): Type A, General. The planned timeframe for commencement and completion of construction of the Project is: 30 working days The Bid Proposal must be accompanied by bid security of ten percent of the maximum bid amount, in the form of a cashier's or certified check made payable to City, or a bid bond executed by a surety licensed to do business in the State of California on the Bid Bond form included with the Contract Documents. The bid security must guarantee that within ten days after City issues the Notice of Award, the successful bidder will execute the Contract and submit the payment and performance bonds, insurance certificates and endorsements, and any other submittals required by the Contract Documents and as specified in the Notice of Award. The successful bidder will be required to provide performance and payment bonds, each for 100% of the Contract Price. The City reserves the right to reject any and all bids and to waive any non-substantive irregularities. Document Note: Contract documents will be made available for electronic download at no cost. Estimated Cost. The estimated construction cost is $306,000 for the base bid and $84,000 for Additive Alternate A Question Deadline 04/15/2025 Questions or requests for clarifications regarding the Project, the bid procedures, or any of the Contract Documents must be submitted in writing to David Lam, Associate Engineer, at dlam@albanyca.org. Oral responses are not authorized and are not binding on the City. Bidders should submit any such written inquiries at least five working days before the scheduled bid opening. Questions received any later might not be addressed before the bid deadline

Post-Bid

Roads / Highways

$306,000.00

Public - City

Paving, Site Work

18

10

9

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
490
Active Projects
208
Bidding Soon
2,984
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.