Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published October 14, 2025 at 8:00 PM
Updated October 15, 2025
Site work and paving for a road / highway in Tinley Park, Illinois. Completed plans call for site work for a road / highway; and for paving for a road / highway.
** As of 06/05/2025 project has been awarded to LPS Pavement Company with an amount of $225,112.50.** Site Directions: North Street at Oak Park Ave Est. Completion Date: June 13, 2025 Description: The base bid for this contract includes the completion of resetting the existing UNILOCK pavers on North Street except for the 3 (three) crosswalks (Piano Keys). This includes the removal, cleaning of the existing pavers, leveling the aggregate bedding course, (CA 15), resetting the existing pavers, replacement of broken pavers (Village will provide the replacement pavers), power washing the pavers once set, and installation of the jointing stone, CA 15 and traffic control. The Alternate bid for this contract includes the completion of installation of new UNILOCK pavers on North Street except for the 3 (three) crosswalks (Piano Keys). This includes the removal, gentle cleaning of the existing pavers and stacking them on pallets for the Village to stored, leveling the aggregate bedding course, (CA 15), installation of new pavers supplied by the contractor, and the installation of the jointing stone, CA 15 and traffic control. Please contact the Village of Tinley Park (708) 444-5500 (Darlene Milanowicz) for additional information. SCOPE OF WORK The work included in this contract consists of furnishing all labor, materials, equipment, and other incidentals necessary for the completion of resetting the existing UNILOCK pavers on North Street except for the 3 (three) crosswalks (Piano Keys) and other incidental and miscellaneous items of work in accordance with the Standard Specifications and these Special Provisions.
Award
Roads / Highways
$195,750.00
Public - City
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
11
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 7, 2025
May 7, 2025
North St, Tinley Park, IL
Related To This Project
Tinley Park, IL
Bid Date: Apr 22 2025
Tinley Park, IL
Bid Date: Apr 14 2025
Tinley Park, IL
Bid Date: Apr 30 2025
Tinley Park, IL
--
Tinley Park, IL
Bid Date: Jun 06 2025
Tinley Park, IL
Bid Date: May 21 2025
Tinley Park, IL
Bid Date: May 28 2025
Tinley Park, IL
Bid Date: Jun 10 2025
Tinley Park, IL
--
Tinley Park, IL
Bid Date: Mar 31 2025
Tinley Park, IL
Bid Date: Mar 31 2025
Tinley Park, IL
Bid Date: Mar 24 2025
Tinley Park, IL
Bid Date: Mar 24 2025
Tinley Park, IL
Bid Date: Mar 24 2025
Tinley Park, IL
Bid Date: Apr 03 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
