EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 11, 2025 at 8:00 PM

Updated October 1, 2024

Site work and paving for a mixed-use development in Bloomfield Township, Michigan. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

Reference Number 0000381043 The project consists of repairing approximately 5,750 Sft of existing concrete safety paths, 3,200 Sft of exiting segmental block retaining walls, and replacement of 1,100 Lft of existing split rail fencing with new split rail fencing at eleven (11) separate locations within the Township. Site work varies, and includes clearing, removal of existing walls and regrading, sidewalk removal and replacement, reconstruction of existing segmental block retaining walls, removal of split rail fencing, installation of new split rail fencing, drainage improvements, landscaping, and associated restoration. Question Deadline 04/17/2025 at 2:30 PM ET Questions are submitted online No Proposals submitted by Contractors who have been debarred, suspended, or made ineligible by any Federal Agency will be rejected. Each bidder agrees to waive any claim it has or may have against the Owner, the Architect/Engineer, and their respective employees, arising out of or in connection with the administration, evaluation, or recommendation of any bid. Each bid proposal shall be submitted on the proposal forms provided and shall be accompanied by a certified check, cashier's check or bid bond, executed by the bidder and Surety Company, payable to the Township of Bloomfield in the amount of Five Percent (5%) of the accompanying bid. Proposal Guarantee shall provide assurance that the bidder will, upon acceptance of the bid, execute the necessary contract with the Township. No bid may be withdrawn after the scheduled closing time for receiving bids for at least sixty (60) days. The successful bidder will be required to furnish satisfactory Performance, Labor and Material, and Maintenance and Guarantee Bonds. The Township of Bloomfield reserves the right to reject all bids and to waive irregularities in bidding. No Proposal will be received unless made on blanks furnished and delivered to the Bloomfield Township Dave Payne Public Services Building on or before 2:30 p.m. Local Time on April 17, 2025. All Bidders must meet the requirements set forth in the Township's prequalification statement. The Township will require at least three (3) satisfactory municipal references for similar work in the last two (2) years in Michigan for all contracts with a value greater than $50,000.00. ** doc info : Please contact the offices of Hubbell, Roth & Clark, Inc. by email frontdesk@hrcengr.com or call the office at (248) 454-6300 to obtain plans and specifications. for each set of Drawings and Specifications. An electronic copy of the bid documents will be included with each set purchased. Bidders are advised that to submit a proposal on this project, original documents purchased from Hubbell, Roth & Clark, Inc. must be used. The work under this Contract shall consist of the furnishing of all labor, material, equipment, services, and all incidental items necessary to complete the project in accordance with the Contract Documents. Description of Work The project consists of repairing approximately 5,750 Sft of existing concrete safety paths, 3,200 Sft of exiting segmental block retaining walls, and replacement of 1,100 Lft of existing split rail fencing with new split rail fencing at eleven (11) separate locations within the Township. Site work varies, and includes clearing, removal of existing walls and regrading, sidewalk removal and replacement, reconstruction of existing segmental block retaining walls, removal of split rail fencing, installation of new split rail fencing, drainage improvements, landscaping, and associated restoration. Copies of Plans and Specifications and Proposal Forms may be secured on or after March 24, 2025 at the offices of Hubbell, Roth & Clark, Inc., Consulting Engineers, 555 Hulet Drive, Bloomfield Hills, Michigan 48302-0360. Please contact the offices of Hubbell, Roth & Clark, Inc. by email frontdesk@hrcengr.com or call the office at (248) 454-6300 to obtain plans and specifications. Electronic and hard copies thereof for bidding purposes may also be obtained for a non-refundable fee of one hundred twenty ($120.00) Dollars if picked up, or one hundred forty ($140.00) Dollars if mailed, CHECK ONLY, payable to “Hubbell, Roth & Clark, Inc.” for each set of Drawings and Specifications. An electronic copy of the bid documents will be included with each set purchased. Bidders are advised that to submit a proposal on this project, original documents purchased from Hubbell, Roth & Clark, Inc. must be used. Proposals submitted by Contractors who have been debarred, suspended, or made ineligible by any Federal Agency will be rejected. Each bidder agrees to waive any claim it has or may have against the Owner, the Architect/Engineer, and their respective employees, arising out of or in connection with the administration, evaluation, or recommendation of any bid. Each bid proposal shall be submitted on the proposal forms provided and shall be accompanied by a certified check, cashier's check or bid bond, executed by the bidder and Surety Company, payable to the Township of Bloomfield in the amount of Five Percent (5%) of the accompanying bid. Proposal Guarantee shall provide assurance that the bidder will, upon acceptance of the bid, execute the necessary contract with the Township. No bid may be withdrawn after the scheduled closing time for receiving bids for at least sixty (60) days.

Post-Bid

Sidewalks / Parking Lot

$2,000,000.00

Public - City

Paving, Site Work

51

25

2

3

Subscribe For Documents

46 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Closeout Submittals, Bonds
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Structure Moving, Facility Remediation, Transportation and Disposal of Hazardous Materials
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 11 - Equipment

Division 11 - Equipment

Healthcare Equipment, Radiology Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Bedroom Furnishings, Blankets
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Fill, Backfill, Embankments, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Fertilizing, Bases, Ballasts, and Paving, Curbs and Gutters, Site Improvements, Retaining Walls, Irrigation, Planting, Planting Preparation, Mulching, Turf and Grasses, Seeding, Sodding, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Distribution Piping, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Force Mains, Storm Drainage Utilities, Culverts, Pipe Culverts, Fuel Distribution Utilities, Natural-Gas Distribution, Natural-Gas Piping, Hydronic and Steam Energy Utilities, Steam Energy Distribution, Underground Steam and Condensate Distribution Piping
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
206
Active Projects
143
Bidding Soon
1,579
All Active Projects
693
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 17, 2025

June 16, 2025

img_map_placeholder

Multiple Locations, Bloomfield Township, MI

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

2025 Retaining Wall Repair Program

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.