Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published April 18, 2025 at 8:00 PM
Updated April 19, 2025
Site work and paving for a mixed-use development in Mentmore, New Mexico. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.
SCOPE OF WORK 3.1 General Project Description, FP-14 N546- Shiprock Chapter, AZ. This work consists of 1) Road Reconditioning. This work consists of reconditioning ditches, shoulders, roadbeds, aggregate surfaces, or the entire road. 2) Contractor Sampling and testing, this work consists of obtaining samples for material testing. Subgrade Preparation, the top 6 inches shall be compacted to 95% of the maximum density. 3) Aggregate Base Coarse (ABC) placement. Minor Crushed Aggregate, this work consists of furnishing and placing crushed aggregate for bedding, backfill, and roadway aggregate on a prepared surface. Appendix D- Typical Cross Section with ABC a. Delivery and Placement of ABC. b. 3/4" Nominal Maximum Aggregate size. c. 2.0 miles, with 3,887 Tons 4) Double Chip Seal; 10,560-foot length by 20-foot uniform width 5) Fog Seal application; 10,560-foot length by 20-foot uniform width 6) Clearing and Grubbing- This work consists of clearing and grubbing within the clearing limits designated in the plans. 7) Permanent Signage placement, this work consists of installing traffic control devices. Two (2)- Type R2-1 (15mph), 24"x30" (Conventional). One (1)- Caution Sign (T Intersection Caution Sign) Pavement Markers, non-plowable for 10,560 feet Performance Bond: Include in the proposal a letter from the Surety Company assuring that a Performance Bond can be issued upon the execution of a contract. When the contract is executed, the Contractor shall provide to the Navajo Nation a Performance Bond underwritten and executed by Surety Company that guarantees the Contractor's complete and satisfactory performance under the Contract. The Performance Bond shall be equal to one hundred percent (100%) of the Original Contract Amount, unless otherwise provided in the Lesser Bond Amounts. The Payment Bond: The Contractor shall provide to the Navajo Nation a Payment Bond underwritten and executed by a Surety Company that will protect all persons, subcontractors, or other entities supplying labor and material to the Contractor or its subcontractors for the performance under this Contract. The Payment Bond shall be in an amount equal to one hundred percent (100%) of the Original Contract Amount, unless otherwise provided the Lesser Bond Amounts. The Payment Bond must be provided in addition to the Performance Bond required in Article Ea. herein. REJECTION OF PROPOSALS: The Navajo Division of Transportation (Navajo DOT) - Department of Roads reserves the right to reject any or all proposals and to waive informalities and minor irregularities in the proposals received. Question Deadline 04/09/2025 at 3:00 PM MT
Post-Bid
Roads / Highways
$800,000.00
Public - Federal
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
4
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 17, 2025
May 19, 2025
Multiple Locations, Mentmore, NM
Related To This Project
Mentmore, NM
Bid Date: Aug 08 2025
Mentmore, NM
Bid Date: Mar 31 2025
Mentmore, NM
Bid Date: Mar 10 2025
Mentmore, NM
Bid Date: Jul 12 2024
Mentmore, NM
--
Mentmore, NM
Bid Date: Aug 16 2024
Mentmore, NM
Bid Date: Jul 06 2023
Mentmore, NM
Bid Date: Jun 16 2023
Mentmore, NM
Bid Date: Jun 02 2023
Mentmore, NM
Bid Date: Apr 07 2023
Mentmore, NM
Bid Date: May 20 2022
Mentmore, NM
Bid Date: May 23 2022
Mentmore, NM
Bid Date: Oct 06 2022
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
