Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published April 29, 2025 at 8:00 PM
Updated April 30, 2025
Site work and paving for a road / highway in Hall Township, Illinois. Completed plans call for site work for a road / highway; and for paving for a road / highway.
Milling, resurfacing, aggregate shoulders, rumble strips, pavement marking, raised reflective pavement markers, and other related construction items on IL Route 89 beginning at the north approach pavement of SN 006-0178 and ending at Cleveland St in Ladd. It also includes the djacent I-80 Frontage Rd beginning at IL 89 intersection and ends at the Ladd Maintenance facility. Region : 2 District : 3 Federal Project # STP0HLS(903) County(S): Bureau Key Route(S): FAP 698 Marked Route(S) : IL 89/I-80 Frontage Rd Section(S) : (102, FRONTAGE RD.)RS-5 State Job #(S) :C-93-066-25 Pps #(S) : 3-77700-0230 3-77700-0240 Contract Specifics Completion Date: 40 Working Days Questions Not Accepted as of April 15, 2025 04:30 Pm Questions Directed to: Idot Contracts Office Harry R. Hanley Building Room 326 2300 South Dirksen Parkway Springfield, Il 62764 (217) 782-7806 Fax: (217) 785-1141 Tdd: (217) 524-4875 Dot.de-contracts@illinois.gov Unless Otherwise Indicated, a Proposal Guaranty is Required by Bid Bonds, Cashiers Check or Properly Certified Check for Not Less Than 5 (Five) Percent of the Bid Amount. If the Proposal is Accepted and the Bidder is Declared Not Responsive, It is Hereby Agreed That the Amount of the Proposal Guaranty Will Become the Property of the State of Illinois and Shall Be Considered as Payment of Damages Due to the Delay and Other Causes Suffered by the State Because of the Failure to Adhere to the Procedures Required. Otherwise, the Bid Bond Will Become Void or the Proposal Guaranty Check Will Be Returned to the Bidder. Contractors Who Desire to Become Prequalified or to Renew Their Prequalification for This Letting Must File With the Department of Transportation, Bureau of Construction, Room 322, 2300 South Dirksen Parkway, Springfield, Illinois 62764, a Contractors Statement of Experience and Financial Condition No Later Than 4:30 Pm Prevailing Local Time, April 04, 2025. A Contractor Will Not Be Prequalified for This Letting Unless the Statement is Received Before the Time and Day Established. The Department Reserves the Right to Reject Any and All Bids, to Waive Minor or Immaterial Irregularities, Informalities or Technicalities, to Advertise for New Bids, or to Request Confirmation or Clarification From Any Bidder Regarding a Bid. ILDOT - 076 - Milling, Resurfacing, Aggregate Shoulders, Rumble Strips, Pavement Marking, Raised Reflective Pavement Markers - IL 89/I-80 Frontage Rd
Bid Results
Roads / Highways
$987,951.00
Public - State/Provincial
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 25, 2025
June 24, 2025
IL-89 & Frontage Rd, Hall Township, IL
Related To This Project
Hall Township, IL
Bid Date: Apr 25 2025
Hall Township, IL
Bid Date: Feb 25 2025
Hall Township, IL
Bid Date: Mar 11 2024
Salem, IL
Bid Date: Apr 01 2025
CMP Culvert Entrance Removal and Replacement With a Precast Concrete Box Culvert on IL 116 - 5731995
Pontiac, IL
Bid Date: Apr 25 2025
Mattoon, IL
Bid Date: Apr 01 2025
North Chicago, IL
Bid Date: Apr 02 2025
Metamora, IL
Bid Date: Apr 29 2025
Elk Grove Village, IL
Bid Date: Apr 08 2025
Matteson, IL
Bid Date: Apr 10 2025
Coral, IL
Bid Date: Apr 25 2025
East Moline, IL
Bid Date: Apr 15 2025
Loves Park, IL
Bid Date: Apr 08 2025
Chicago, IL
Bid Date: Apr 17 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
