Published April 14, 2025 at 8:00 PM

Updated April 18, 2025

Demolition, site work, renovation and addition to a civil project in Tomball, Texas. Completed plans call for the addition of a water / sewer project; for the demolition of a water / sewer project; for the renovation of a water / sewer project; and for site work for a water / sewer project.

Webber Waterworks is requesting proposals from interested suppliers and subcontractors to perform specified scopes of supply on the construction of the South Wastewater Treatment Plant Expansion Project, a brownfield expansion from 1.5 MGD to 3.0 MGD average daily flow (ADF) wastewater treatment for the CITY OF TOMBALL. The project will include the conversion of existing lift station to a coarse screen structure, headworks improvements (addition of a second fine screen, replacement of grit removal system, and new dumpster area), replacement of existing RAS pump station (for existing clarifiers), replacement of existing digested sludge feed pumps, replacement of centrifuge in the existing dewatering building and expansion of the administration building. The following new facilities will also be constructed: influent lift station, aeration basin and blower buildings, clarifiers, Return Activated (RAS)/Waste Activated Sludge (WAS) pump station, filters, Ultraviolet (UV) disinfection system, vacuum truck receiving station, natural gas generators, electrical building and electrical and instrumentation improvements associated with the above items. Nearly every trade in the waterworks industry will be required. Competitive sealed proposals for individual scopes of work on the project will be submitted in accordance with each individual work package requirements. BP2-01.01_Site Work and Process Facilities Package Furnish all labor, material, tools, supplies, services, equipment and incidentals to perform Site Work and Process Facilities package as per Contract Documents , unless otherwise specifically excluded or provided by CMAR or others as detailed herein . The major elements and facilities included in the scope of this package are: 1. Coarse Screen 2. Coarse Screen Dumpster Building 3. Influent Lift Station 4. Headworks 5. Headworks Dumpster Canopy 6. Splitter Box 7. Aeration Basins 8. Aeration Basins Blower Building 9. Final Clarifiers 3 & 4 10. Scum Pump Station No.2 11. RAS/WAS Pump Stations 12. Tertiary Filters 13. UV Disinfection 14. Rotary Drum Thickeners 15. Dewatering Building 16. Vacuum Truck Receiving Station 17. Generator Pad 18. Installation of Yard Piping and Manholes 19. Excavation, Site Preparation, and grading as per Contract Documents 20. Install temporary construction road, parking and laydown areas 21. Final road preparation and paving Only one drain line per valve pad is required, for a total of two, 4 inch drain lines. The floor drain can be seen on ILS-M1. The value reflects that of the overall project and not necessarily this particular package*

Post-Bid

Water / Sewer

$4,000,000.00

Public - City

Addition, Demolition, Renovation, Site Work

352

47

10

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
376
Active Projects
201
Bidding Soon
3,521
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.