BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 12, 2025 at 8:00 PM

Updated April 18, 2025

Demolition, site work, renovation and addition to a civil project in Tomball, Texas. Completed plans call for the addition of a water / sewer project; for the demolition of a water / sewer project; for the renovation of a water / sewer project; and for site work for a water / sewer project.

Provide a detailed Scope of Work to demonstrate a full understanding of the elements involved to construct the plant work, identifying scope inclusions and exclusions (One-page limit). Webber Waterworks is requesting proposals from interested suppliers and subcontractors to perform specified scopes of supply on the construction of the South Wastewater Treatment Plant Expansion Project, a brownfield expansion from 1.5 MGD to 3.0 MGD average daily flow (ADF) wastewater treatment for the CITY OF TOMBALL. The project will include the conversion of existing lift station to a coarse screen structure, headworks improvements (addition of a second fine screen, replacement of grit removal system, and new dumpster area), replacement of existing RAS pump station (for existing clarifiers), replacement of existing digested sludge feed pumps, replacement of centrifuge in the existing dewatering building and expansion of the administration building. The following new facilities will also be constructed: influent lift station, aeration basin and blower buildings, clarifiers, Return Activated (RAS)/Waste Activated Sludge (WAS) pump station, filters, Ultraviolet (UV) disinfection system, vacuum truck receiving station, natural gas generators, electrical building and electrical and instrumentation improvements associated with the above items. Nearly every trade in the waterworks industry will be required. Competitive sealed proposals for individual scopes of work on the project will be submitted in accordance with each individual work package requirements. BP5-01.01_ Sitewide SCADA, Instrumentation & Control Package Package Description: A. Furnish all labor, material, tools, supplies , services, e quipment and incidentals to perform all SCADA, Instrumentation & Control s Work for the Project as per Contract Documents , unless otherwise specifically excluded or provided by CMAR or others as detailed herein . Submit All RFIs No Later than April 04, 2025 **Please ensure you use the Work Package Checklist to ensure you are sending all of the required documentation on or before bid time. Webber requests bidders to submit itemized pricing breakdowns and quantities to assist with proposal evaluation. Please click on orange banner at the top of this email to View Project and Accept or Decline this Project. You can upload your bid documents into Smartbid directly, mail it, send it via fax, or scan and email it to us prior to bid due date and time to waterworks.bids@wwebber.com The value reflects that of the overall project and not necessarily this particular package*

Post-Bid

Water / Sewer

$4,000,000.00

Public - City

Addition, Demolition, Renovation, Site Work

355

43

12

2

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
376
Active Projects
201
Bidding Soon
3,521
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.