BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 23, 2025 at 8:00 PM

Updated May 24, 2025

Renovation of a water / sewer project in Canby, Oregon. Completed plans call for the renovation of a water / sewer project.

The owner has selected a Design Builder. A timeline for construction has not yet been established. Deadline for written request for clarification April 4, 2025 Direct all questions regarding the RFP to Monica Stone, WWTP Supervisor, at Stonem@canbyoregon.gov (email) or (503) 266-0648 (direct). Notice to Proceed June 2, 2025 Complete Design Late Summer 2025 Lead Times 9 Months Anticipated Start of Construction Spring 2026 Anticipated End of Construction Winter 2026 The City of Canby, Oregon (City) requests competitive proposals from experienced design-build teams to assist the City in planning, designing, procuring, and installing a new Ultraviolet (UV) Disinfection System to meet the City's NPDES permit requirements. The City plans to abandon the existing in-vessel UV system and to retrofit adjacent infrastructure that was once utilized as an open-channel, horizontal UV system. The City may reject any proposal not in compliance with all prescribed public bidding procedures and requirements and may reject for good cause any or all proposals upon determination by the City that it is in the public interest to do so. Proposers are required to certify non-discrimination in employment practices and identify resident status as defined in ORS 279A.120. All proposers are required to comply with the provisions of Oregon Revised Statutes and Local Contract Review Board Policy. Liquidated Damages. Design-Builder understands that if Substantial Completion is not attained by the Scheduled Substantial Completion Date, Owner will suffer damages which are difficult to determine and accurately specify. Design-Builder agrees that if Substantial Completion is not attained by the Scheduled Substantial Completion Date (the "LD Date"), Design-Builder shall pay Owner Five Hundred Dollars ($500.00) per day, unless otherwise modified when the Contract Price (GMP) Amendment is executed, as liquidated damages for each day that Substantial Completion extends beyond the LD Date. Design-Builder understands that if Final Completion is not achieved within thirty (30) days of Substantial Completion Date, Owner will suffer damages which are difficult to determine and accurately specify. DesignBuilder agrees that if Final Completion is not achieved within thirty ( 30 ) days of Substantial Completion, Design-Builder shall pay to Owner Five Hundred Dollars ($500.00) per day, unless otherwise modified when the Proposal is accepted, as liquidated damages for each calendar day that Final Completion is delayed beyond the above-referenced number of days. Question Deadline 04/10/2025

Award

Water / Sewer

$2,000,000.00

Public - City

Renovation

27

10

4

1

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
137
Active Projects
74
Bidding Soon
1,089
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 17, 2025

July 7, 2025

Project location map

1480 NE Territorial Rd, Canby, OR

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.