BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 19, 2025 at 8:00 PM

Updated May 20, 2025

Site work and paving for a road / highway in Charlestown Township, Pennsylvania. Completed plans call for site work for a road / highway; and for paving for a road / highway.

** As of 05/19/2025 project has been awarded to Ply-Mar construction Co. Inc. for $735,852.25.** Phoenixville Pike at Sidley Rd & Yellow Springs Rd Improvements The scope of work generally includes excavation, full depth pavement, milling and overlay, stormwater, minor concrete with ADA ramps, pavement markings, signs, and signalization items. Question Deadline 04/10/2025 at 12:00 PM ET Location online portal. The work indicated will be at a minimum, partially funded via Multimodal Transportation Fund (MTF) grants from the Commonwealth of Pennsylvania acting through the Commonwealth Financing Authority. The bidding process, contract, and conduct of the work must meet the requirements of the MTF grant agreements, which has been entered into by Charlestown Township, and the Commonwealth of Pennsylvania. The agreement(s) obligates Charlestown Township to certain compliance requirements. If said compliance requirements are not followed, funding for the project will be at risk. Bidder's attention is directed to the Technical Specifications Section of the bid package, which contains the MTF Reimbursement Agreements and related Additional Special Provisions as an attachment. These documents outline the specific requirements of the MTF program. Submission of a bid for this Project will be considered the Contractors acknowledgement of these requirements and commitment to adhere to the same. Each bid shall be accompanied by a bidder's bond, certified check or cashier's check, in favor of Charlestown Township in the amount of not less than 10% of the total amount of the bid. The successful bidder shall be bound to furnish and pay for a Performance Bond and a Labor & Material Payment Bond in an amount equal to one hundred percent (100%) of the contract price, on bond forms provided by Charlestown Township. All bidders must be PennDOT pre-qualified and must complete a non-collusion affidavit. This contract is in accordance with the Pennsylvania Prevailing Wage Act, and the successful bidder shall pay no less than the Wage Rates determined for the project as stated in the Contract documents. There is a zero percent verify requirement for MBE and/or WBE participation. Award of the Contract, if the contract is awarded, will be to the lowest responsible bidder, however Charlestown Township reserves the right to reject any and or all bids on any basis and to waive any informality in the bidding, as permitted by law. No bidder may withdraw a bid after the actual date of the opening thereof. Bidders must submit with their bids, the non- collusion affidavit contained in the contract documents.

Award

Roads / Highways

$735,852.00

Public - City

Paving, Site Work

42

18

3

Subscribe For Documents

30 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
208
Active Projects
13
Bidding Soon
3,012
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 17, 2025

May 19, 2025

Project location map

Sidley Hill Rd & Yellow Springs Rd, Charlestown Township, PA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.