BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 13, 2025 at 8:00 PM

Updated May 14, 2025

Site work, paving and outdoor lighting for a mixed-use development in Berkley, Michigan. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; for outdoor lighting for a sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Reference Number 0000384805 Job Location: Eleven Mile and Tyler Ave The approximate amount of work involved in the project are as follows: Removal of concrete alley and concrete parking lots. Repair or replacement of existing storm and sewer structures as needed. Replace concrete alley pavement in concrete. Replace parking lot with asphalt pavement. Construct sitting areas in concrete pavement. Prep planting beds with topsoil and irrigation. Install one fire table in each lot with connections to new electrical service and natural gas service. Prepare electrical hook up by others by installing electrical service and riser mounted board. Install and run wire for required gas and electrical conduit. One central seating area in each lot shall have one pedestal outlet installed for public use. Install overhead string lighting in the alley for each lot to be hard wired to new electrical service. Install ground-mounted uplighting below water tower using existing electrical service provided at water tower. Adjacent businesses are to be accessible to the public as much as possible during construction. Some wrong way driving will be necessary during the paving and curing of some concrete approaches. Additional barricades and cones may be necessary to direct traffic during this time. Items that were removed from this re-bid that were in the original bid letting from March 2025 include the following: Bioswales, EV Charging Stations, and new signage. We have provided more details regarding product selection, although alternatives will be considered. Several lump sum inclusive items have been divided into separate pay items for clarification. Adjacent businesses are to be accessible to the public as much as possible during construction. Question Deadline 05/09/2025 at 5:00 PM ET Questions are submitted online Yes, Contact Dan Samuel at (248) 691-7452 with specific questions about this bid. Each proposal shall be accompanied by a certified check, cashier's check, money order or bid bond by a surety company licensed to do business in the State of Michigan in the amount of at least five (5%) percent of the amount bid, drawn payable to the City of Oak Park, Michigan, as security for the proper execution of the Contract. The successful bidder will be required to provide performance bonds, and payment bonds each in the amount of one hundred percent (100%) of the contract amount, and a maintenance and guarantee bond in the amount of Fifty percent (50%) of the contract amount. The City of Oak Park, Michigan reserves the right to reject any and all bids in its sole discretion in whole or in part for any reason or for no reason at all. Any informalities or irregularities in bids may be waived by the City of Oak Park for any reason, or for no reason at all, in the sole discretion of the City. Bids may not be withdrawn for a period of sixty (60) days after the actual date of opening thereof. A. Work shall consist of a Portland cement concrete pavement constructed on a prepared sub grade in accordance with these specifications and in conformity with the lines and grades and typical cross-sections as established by the Engineer. B. Concrete pavement will be paid for at the contract in full for furnishing all materials, as specified including dowels, tie bars and joint materials and furnishing all equipment, tools, labor, and all work incidental to the laying, curing, protection ofthe concrete and constructing the pavement complete.

Post-Bid

Sidewalks / Parking Lot

$500,000.00

Public - City

Outdoor Lighting, Paving, Site Work

17

12

2

4

Subscribe For Documents

69 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
318
Active Projects
124
Bidding Soon
2,456
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 13, 2025

June 2, 2025

Project location map

Tyler Ave & W Eleven Mile Rd, Berkley, MI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.