Published April 22, 2025 at 8:00 PM

Updated April 23, 2025

Renovation of a mixed-use development in West Des Moines, Iowa. Completed plans call for the renovation of a fire / police facility; and library.

The construction documents indicate that the project involves mechanical and electrical improvements at the West Des Moines Public Library and Public Safety Station 22. Mechanical System Upgrades at the West Des Moines Public Library include the removal and replacement of air handling units (AHUs), ductwork, and piping. New work includes the installation of a Dedicated Outdoor Air System (DOAS) and one (1) new AHU. The new HVAC equipment will be reconnected to existing building systems and will then be tested, balanced, and commissioned. BASE BID Library - $1, 870000 Public safety - $134,000.00 TOTAL $2,004,000.00 Electrical system modifications will include the relocation of an electrical panel, rerouting of circuits, and the connection of new mechanical equipment to power and control systems. Key components being installed at public safety station 22 include new rooftop-mounted energy recovery equipment, new ductwork, and new electrical connections as needed. All bids shall be made on the form furnished by the City through wdm.ionwave.net and shall be filed on or before the time specified above. Each proposal shall be electronically accompanied by a scanned copy of the bid bond or a scanned copy of a cashier's or certified check drawn on an Iowa bank or a bank chartered under the laws of the United States in an amount equal to ten percent (10%) of the total amount of the bid. If a bid bond is submitted it must be on the form provided with the contract documents. A physical copy of the bid security will be required to be submitted to the City Clerk's Office by the apparent low bidder within 48 hours of the bid deadline. The successful bidder will be required to furnish a performance and payment bond in the amount of one hundred percent (100%) of the contract price guaranteeing faithful performance of the contract and guaranteeing payment to all persons supplying labor and/or materials in the execution of the work provided for in the contract. Additionally the contractor must provide the City with a guarantee of maintenance of said improvement in the form of surety for a period of one (1) year from the time of acceptance by the City. Work on said project shall commence within ten (10) days of the written notice to proceed and shall be completed by April 17th, 2026. Liquidated damages in the amount of five hundred dollars ($500.00) per day will be assessed for each day that the work remains uncompleted after the end of the contract period. The City reserves the right to reject any and/or all bids and to waive any and/or all technicalities and/or all irregularities. PROJECT LOCATIONS: WEST DES MOINES PUBLIC LIBRARY 4000 MILLS CIVIC PARKWAY WEST DES MOINES, IA 50625 WEST DES MOINES PUBLIC SAFETY STATION NO. 22 1801 68TH STREET WEST DES MOINES, IA 50266 Questions concerning interpretation or intent of the Contract Documents should be directed to: Corey Metzger, PE Resource Consulting Engineers, LLC 301 Alexander Ave Suite C Ames, IA 50010 (515) 292-2500

Award

Library

$1,187,520.00

Public - City

Renovation

45

10

16

4

Subscribe For Documents

32 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Summary of Work, Work by Owner, Price and Payment Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, References, Definitions, Quality Control, Testing and Inspecting Services, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cutting and Patching, Cleaning and Waste Management, Progress Cleaning, Final Cleaning, Starting and Adjusting
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition
Division 03 - Concrete

Division 03 - Concrete

Cast-in-Place Concrete
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Hardware, Door Hardware, Louvers and Vents
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Partitions
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Rugs and Mats, Runners
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Water-Based Fire-Suppression Systems, Facility Fire-Suppression Water-Service Piping
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Insulation, Plumbing Equipment, Domestic Water Filtration Equipment
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Piping, Steam and Condensate Piping and Pumps, Steam and Condensate Heating Piping, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Turning Vanes, HVAC Fans
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Low-Voltage Electrical Power Conductors and Cables, Control-Voltage Electrical Power Cables, Grounding and Bonding for Electrical Systems, Hangers and Supports for Electrical Systems, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Switchboards and Panelboards, Panelboards, Facility Electrical Power Generating and Storing Equipment
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Operation and Maintenance of Planting, Site Improvements, Fences and Gates
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
88
Active Projects
33
Bidding Soon
799
All Active Projects
326
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 9, 2025

June 9, 2025

img_map_placeholder

Multiple Locations, West Des Moines, IA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.