BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 19, 2025 at 8:00 PM

Updated May 20, 2025

Site work and paving for a civil project in West Des Moines, Iowa. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

Valley Junction Alleys - Phase 9, includes approximately 1,550 LF of Subdrain, 213 SY of Granular Surfacing and 2,175 SY of 6" PCC Pavement with 2,243 SY Modified Subbase. The project also includes Excavation, Construction Staking, Traffic Control, and other related items needed to complete the project. All bids shall be made on the form furnished by the City through wdm.ionwave.net and shall be filed on or before the time specified above. Each proposal shall be electronically accompanied by a scanned copy of the bid bond or a scanned copy of a cashier's or certified check drawn on an Iowa bank or a bank chartered under the laws of the United States in an amount equal to ten percent (10%) of the total amount of the bid. If a bid bond is submitted it must be on the form provided with the contract documents. A physical copy of the bid security will be required to be submitted to the City Clerk's Office by the apparent low bidder within 48 hours of the bid deadline. The successful bidder will be required to furnish a performance and payment bond in the amount of one hundred percent (100%) of the contract price guaranteeing faithful performance of the contract and guaranteeing payment to all persons supplying labor and/or materials in the execution of the work provided for in the contract. Additionally the contractor must provide the City with a guarantee of maintenance of said improvement in the form of surety for a period of four (4) years from the time of acceptance by the City. Work on said project shall commence within ten (10) days of the written notice to proceed and shall be completed by October 31, 2025. Each alley closure shall be limited to a consecutive four (4) week period. Liquidated damages in the amount of Five Hundred dollars ($500.00) per day will be assessed for each day that the work remains uncompleted after the October 31, 2025 completion date and for each day that an alley remains closed after the four (4) week closure period. The City reserves the right to reject any and/or all bids and to waive any and/or all technicalities and/or all irregularities.

Award

Roads / Highways

$374,344.00

Public - City

Paving, Site Work

69

6

5

Subscribe For Documents

39 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
135
Active Projects
95
Bidding Soon
1,101
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 23, 2025

May 23, 2025

Project location map

Multiple Locations, West Des Moines, IA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.