Published May 1, 2025 at 8:00 PM
Updated May 2, 2025
Site work for a power facility in Alexander City, Alabama. Completed plans call for site work for a power facility.
** As of May 1,2025 , project was awarded to Southern States Utility Res but awarded amount is not available.** construction of theDadeville Road Substation - New Feeder Construction The project will consist of Laborand Equipment for installinga new 5-circuit, 3-phase underground line out of the newDadeville Substation, in whichtwo (2) circuits will be a roadbore under Dadeville Highwayconnecting to two (2) 3-phasetermination cabinets, whichshall be installed by Contractor. This will include making upall terminators, elbows, elbowarrestors, and 4-ways on all underground wire, inside and outside of the substation. In addition, install a new double circuit3-phase line along U.S. Highway 280 for approximately 1.1miles. This will include clearinga new right-of-way along U.S. Highway 280 on ALDOT's rightof-way. All right-of-way clearingwill need to be mulched in place.The locations of the right-of-wayto be cleared will be defined onthe Drawings. The Owner reserves the rightto waive any informalities or toreject any or all bids. No bidder may withd The Project will consist of supplying and paying for all labor, equipment, tools, transportation, supervision and other means to perform the work put forth in these PROJECT SPECIFICATIONS. The project will consist of Labor and Equipment for installing a new 5-circuit, 3-phase underground line out of the new Dadeville Substation, in which two (2) circuits will be a road bore under Dadeville Highway connecting to two (2) 3-phase termination cabinets, which shall be installed by Contractor. This will include making up all terminators, elbows, elbow arrestors, and 4-ways on all underground wire, inside and outside of the substation. In addition, install a new double circuit 3-phase line along U.S. Highway 280 for approximately 1.1 miles. This will include clearing a new right-of-way along U.S. Highway 280 on ALDOT's right-of-way. All right-of-way clearing will need to be mulched in place. The locations of the right-of-way to be cleared will be defined on the Drawings
Award
Power Plant
$200,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 14, 2025
May 14, 2025
Dadeville Rd, Alexander City, AL
Related To This Project
Alexander City, AL
Bid Date: Apr 01 2025
Alexander City, AL
Bid Date: Apr 21 2025
Alexander City, AL
Bid Date: May 05 2025
Alexander City, AL
Bid Date: Sep 28 2025
Alexander City, AL
--
Alexander City, AL
Bid Date: Sep 11 2025
Alexander City, AL
Bid Date: Aug 13 2025
Alexander City, AL
Bid Date: Aug 12 2025
Alexander City, AL
Bid Date: Mar 10 2025
Alexander City, AL
Bid Date: Mar 03 2025
Alexander City, AL
Bid Date: Feb 24 2025
Alexander City, AL
Bid Date: Feb 20 2025
Alexander City, AL
Bid Date: Mar 04 2025
Alexander City, AL
Bid Date: Jan 31 2025
Alexander City, AL
Bid Date: Jan 23 2025
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.