Site work for a water / sewer project in E Fairfield, Vermont. Completed plans call for site work for a water / sewer project.

The Maple Run School District (MRUSD) will be accepting bids from Site Contractors for the removal of the existing underground fuel oil tank and installation of a new underground fuel oil tank and accessories located at the Fairfield Central School, located at 57 Park Street, off of Route 36, Fairfield, VT. The Site Contractor will be the lead contractor for this project. This project is outlined in the contract documents within this RFP. All proposals must be submitted on the Bid Form that is part of this RFP. 2. Proposals should be inclusive of all project costs including materials, labor, necessary permits, and equipment as detailed in the Scope of Work. 3. Pricing shall be free of any sales tax. MRUSD is tax exempt and will provide a certificate stating such. 4. Proposals shall be binding and prices shall remain in effect for the duration of the construction period to the completion of the project. 5. Proposals must be accompanied by the required bid bond Form. 6. Proposals shall be signed and clearly identify the name, address, and telephone number of the interested party March 26 - Deadline (EOD) for contractor questions This project consists of removing the existing 9,000 gallon underground Fuel Oil Tank completely. At this time, the MRUSD assumes that there is no contaminated soil associated with removal of this tank. Contractor to install a new 6,000 gallon underground Fuel Oil Tank as shown in the contract documents as designed by Cross Consulting. The Site Contractor will be the lead contractor for this project and is required to coordinate and procure all subcontractors to ensure a complete and finished project. The contractor shall follow the contract documents for the work as needed at the school. There is an alternate for this project, which is removal of a 1,000 gallon underground Fuel Oil Tank located by the old fire station building. All questions will need to go through PCI Consulting. Point of contact at Fairfield Central School = Albert Menard, cell phone = 802-752-2891

Post-Bid

Water / Sewer

$200,000.00

Public - City

Site Work

8

6

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
434
Active Projects
183
Bidding Soon
2,542
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 4, 2025

June 15, 2025

Project location map

57 Park St, E Fairfield, VT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.