Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published May 5, 2025 at 8:00 PM
Updated May 6, 2025
Site work and paving for a civil project in Mineral Point, Wisconsin. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.
Description of Work: The Project consists of water main system replacement and street reconstruction on Davis Street, Washington Street, and Wisconsin Street. Bids will be received for a single prime Contract. Bids shall be on a lump sum and unit price basis, with additive alternate bid items as indicated in the Bid Form. Owner on its own initiative may issue Addenda to clarify, correct, supplement, or change the Bidding Documents. 7.02 Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions are as follows: A. Written inquiries shall be mailed or hand delivered to Mark Digman, P.E., Delta 3 Engineering, Inc., 875 S. Chestnut Street, Platteville, Wisconsin, 53818. B. Electronic inquiries shall be emailed to the following email address: markdigman@delta3eng.biz with the subject line ìProposed 2025 Infrastructure Improvements ñ Mineral Pointî. Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda delivered to all registered plan holders. Questions received less than three days prior to the date for opening of Bids may not be answered. The City of Mineral Point encourages Minority-owned Business Enterprises (MBE's), Women's Business Enterprises (WBE's), Disadvantaged Business Enterprises (DBE's), and Small Businesses in Rural Areas (SBRA's) to submit bids. A municipality, in awarding prime contracts, and primary contractor, in awarding subcontractors, are required to make a good faith effort to achieve a combined minimum goal of participation for MBE/WBE utilization in accordance with s.NR 162.09(3), Wis. Admin. Code. If a subcontractor awards subcontracts, these requirements shall apply to the subcontractor. The certified check or bid bond shall be forfeited to the OWNER as liquidated damages. A pre-Bid conference will not be held for this Project. Bids may not be withdrawn within 90 days after the date of the bid opening. The City of Mineral Point encourages Minority-owned Business Enterprises (MBE's), Women's Business Enterprises (WBE's), Disadvantaged Business Enterprises (DBE's), and Small Businesses in Rural Areas (SBRA's) to submit bids. No proposal will be accepted unless accompanied by a certified check or bid bond equal to at least five percent (5%) of the amount bid, payable to the OWNER as a guarantee that, if the bid is accepted, the Bidder will execute and file the proper contract and bond within 15 days after the award of the contract. The certified check or bid bond will be returned to the Bidder as soon as the contract is signed. The Owner Reserves the Right to Waive Any Informalities, or to Reject Any or All Bids, or Any Part of a Bid, and to Award the Contract to the Bidder, Who in the Judgment of the Owner, Will Best Serve the Interest of the Owner.
Award
Roads / Highways
$304,994.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 3, 2025
May 5, 2025
Multiple Locations, Mineral Point, WI
Related To This Project
Mineral Point, WI
--
Mineral Point, WI
--
Mineral Point, WI
--
Mineral Point, WI
--
Mineral Point, WI
Bid Date: Sep 04 2025
Mineral Point, WI
Bid Date: Oct 09 2025
Mineral Point, WI
Bid Date: Oct 09 2025
Mineral Point, WI
--
Mineral Point, WI
--
Mineral Point, WI
Bid Date: Dec 05 2024
Mineral Point, WI
Bid Date: Nov 12 2024
Mineral Point, WI
Bid Date: Sep 27 2024
Mineral Point, WI
--
Mineral Point, WI
--
Mineral Point, WI
Bid Date: Jun 13 2024
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
