BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 13, 2025 at 8:00 PM

Updated June 14, 2025

Site work and paving for a mixed-use development in Deer Park, Washington. Completed plans call for site work for a playground / park / athletic field; sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

2025 Splash Pad The project consists of the construction of a 2,500 square foot splash pad in Mix Park. Ordering and installation of splash pad features with piping hookups and connections will be required. Additional sidewalk features will be made, along with site grading and the restoration of landscaping. Utility connections will be made to nearby facilities. In person acceptance of delivered bids will be available during posted City Hall hours prior to the bid opening deadline. All contractors must be licensed to conduct business in Washington State. All bid proposals shall be accompanied by a bid proposal deposit in the form of a certified check, cashier's check, or surety bond in an amount equal to five percent (5%) of the amount of such bid proposal. Only properly executed proposals submitted on the forms furnished by the City of Deer Park will be accepted. All bidders are required to submit a list of subcontractors that will perform work on the project amounting to ten percent (10%) or more of the contract amount. Rejection of Bids: The City of Deer Park shall have the right to reject any or all bids not accompanied by bid security or data required by the bidding document or a bid in any way incomplete or irregular. The City of Deer Park shall have the right to reject all bids and not award the Work to any bidder. The City of Deer Park is an Equal Opportunity and Affirmative Action Employer. Disadvantaged Business Enterprises (Small, Minority- and Women-Owned Businesses) are encouraged to submit bids. All work performed on the project will be subject to State prevailing wage rates. Award of the construction contract is contingent upon approval by the funding agency.

Award

Playgrounds / Parks / Athletic Fields

$1,047,587.00

Public - City

Paving, Site Work

53

8

15

5

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
39
Active Projects
19
Bidding Soon
290
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 8, 2025

May 8, 2025

Project location map

301 W 4th St, Deer Park, WA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.