Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published April 23, 2025 at 8:00 PM
Updated April 24, 2025
Renovation of an educational facility in Norfolk, Virginia. Completed plans call for the renovation of a 66,430-square-foot educational facility.
Azalea Gardens Middle School Roof Replacement The purpose of this Invitation for Bid (IFB) is to solicit sealed bids for a contractor to provide roof removal and replacement services to Norfolk Public Schools (hereinafter referred to as NPS). Bidders responding to this request must be responsible, regularly and practically engaged in providing the goods and/or services requested in this IFB, and possess ample resources for fulfilling requirements as detailed in this IFB. The awarded contractor should also be able to provide reports updating progress, such as a Daily Construction Report (samples may be requested by the awarded contractor), and to attend meetings/briefings with the Owner or the Owner's Representative to review project status. All bidders shall be actively engaged in this field for a period of not less than three (3) years. The Project consists of the removal and replacing low slope roofing with a new Single-Ply Modified Membrane roofing system at Azalea Gardens Middle School totaling approximately 66,430 +/- square feet of roof area. The Owner, Norfolk Public Schools, will furnish the roofing materials (Tremco) for the project. The bidder shall provide all other needed materials not labeled as "provided/furnished by Owner," Norfolk Public Schools. The work of this project includes but is not limited to the following: 1. Removal of the existing roof assembly in low slope areas of the roof and Replacing it with the new specified roofing assemblies. Primary roofing system materials will be provided by the Owner. 2. Minor alterations to existing metal wall and roof panel systems where indicated. 3. Removal and disposal of the hazardous materials that are defined in the contract documents. 4. Removal and reinstallation or replacement of Plumbing, Mechanical and Electrical items in support of roofing system removal and replacement. 5. Roofing System Removal and Replacement at the barrel-vault roof over the Gymnasium is Identified as Alternate Bid #1. Period of Contract: The resulting contract shall be from the date of issuance on the Purchase Order or the Notice to Proceed through SEPTEMBER 30, 2025. The Contractor shall substantially complete all work by August 18, 2025, in accordance with the Contract Documents. Final Completion shall be September 18, 2025. Question Deadline 04/11/2025 at 10:00 AM ET The deadline for submitting questions. Oral comments and/or instructions do not form a part of this IFB. All questions MUST be in the form of an email to Buyer.
Award
Educational
$2,567,110.00
Public - State/Provincial
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
