Published May 9, 2025 at 8:00 PM

Updated October 1, 2024

Renovation of an educational facility in Champaign, Illinois. Completed plans call for the renovation of a educational facility.

Contract Division 05 - Electrical Work Deadline for bidder Requests for Information (RFI) is 4/28/2025 Questions will be submitted above date and time. Par (bldg. # 0105): the pennsylvania avenue residence hall (par) commons building has two hydraulic elevators - one public passenger elevator and one freight elevator. The scope of work in par includes complete modernization of the private freight elevator. The elevator has two stops that include the basement and level one. The elevator machine room is in the subbasement where elevator machinery is openly exposed to building utilities. The elevator is currently operationalrefer to division 01 of the technical specifications for a complete, detailed breakdown of the base bids and alternates for this project.Sherman hall (bldg. #0291): the sherman hall has one "Sidewalk lift" hydraulic elevator. The elevator has two stops that include the basement and the loading dock. The elevator lifts through a pair of bi-fold steel doors for full extension to the loading dock level. The machine room is in the boiler room, which is accessed via stairs, where elevator machinery is openly exposed to building utilities. There is a nearby freestanding fire rated elevator machine room serving another elevator in the boiler room. The elevator is currently non-operational.This project includes a roject labor agreement that will be executed between the lowest responsible/responsive bidder and the east central illinois building and construction trades council. A copy of the project labor agreement is included at the end of section 00 99 00. This project includes a Project Labor Agreement that will be executed between the lowest responsible/responsive bidder and the East Central Illinois Building and Construction Trades Council. A copy of the Project Labor Agreement is included at the end of Section 00 90 00. 5 - Electrical Work 30 N/A N/A N/A 3

Post-Bid

Educational

$200,000.00

Public - State/Provincial

Renovation

47

19

15

4

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Control, Testing and Inspecting Services, Execution and Closeout Requirements, Examination and Preparation, Field Engineering, Construction Layout, Execution, Application, Cutting and Patching, Cleaning and Waste Management, Progress Cleaning, Final Cleaning, Starting and Adjusting, Protecting Installed Construction, Closeout Submittals, Bonds, Warranties, Project Record Documents, Commissioning
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition
Division 03 - Concrete

Division 03 - Concrete

Cast-in-Place Concrete
Division 04 - Masonry

Division 04 - Masonry

Masonry, Common Work Results for Masonry, Unit Masonry, Concrete Unit Masonry
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Fabrications
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Fire and Smoke Protection, Firestopping, Smoke Seals
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Panel Doors, Hardware, Door Hardware
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Carpeting, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Exterior Specialties, Protective Covers, Canopies
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Bedroom Furnishings, Blankets, Furniture
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Escalators and Moving Walks, Scaffolding, Other Conveying Equipment, Facility Chutes
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Fire Suppression, Water-Based Fire-Suppression Systems, Facility Fire-Suppression Water-Service Piping
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping, Domestic Water Pumps
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Hangers and Supports for HVAC Piping and Equipment, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Piping, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings, Central HVAC Equipment, Decentralized HVAC Equipment, Convection Heating and Cooling Units
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Hangers and Supports for Electrical Systems, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Lighting, Interior Lighting, Exterior Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Backfill, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Flexible Paving, Planting, Plants, Trees
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists, Hoists

Find More Local Projects

Within 75 Miles of This Project
75
Active Projects
33
Bidding Soon
565
All Active Projects
281
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 8, 2025

June 9, 2025

img_map_placeholder

Multiple Locations, Champaign, IL


Cut Costs, Not Corners.

Get Access Now

Get the right
data with Project Intelligence

Share with your network.

Elevator Modernization - PAR and Sherman Hall

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.