BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 24, 2025 at 8:00 PM

Updated April 25, 2025

Site work for a water / sewer project in Rochester, Minnesota. Completed plans call for site work for a water / sewer project.

Name: J8707 Vol B Civil Underground Utilities and Infrastructure Construction Project The work includes the following approximate quantities of work: Excavation-Common 15981 CY Common Embankment 2242 CY Concrete Pavement 7.0" 6480 SY Concrete Pavement 8.5" 12250 SY Full Depth Repair (Type CD-HV) 280 LF Pavement Replacement (Type CX) 1610 SY 12" RC Pipe Sewer Des 3006 CL V 2822 LF 8" Watermain Ductile Iron CL 52 1511 LF 12" Watermain Ductile Iron CL 52 1918 LF Const Drainage Structure Des 48-4020 489.5 LF 5" Concrete Walk 33430 SF 6" Concrete Walk 14410 SF 5" Colored Concrete Walk 19150 SF Concrete Curb & Gutter Design B624 (MOD) 5510 LF Lighting Units - Type Special, Special 1, Special 2 49 EACH Traffic Control Signal Systems - E, F, M 3 SYS Temporary Signal Systems - D, E, F, H, N 5 SYS Revise Signal Systems - B, D, H, L 4 SYS 6" Solid Line Multi Comp GR IN 15063 LF 8" Solid Line Multi Comp GR IN 13549 LF J NO. 8707 FEDERAL CIG and STATE AID PROJECT NO. TRF-0047-018B and 159-106-020 LOCATION: 2 nd St SW - 31 St Ave SW to 3 rd Ave SE, Rochester, MN, Existing Bridge 55051 and Existing Bridge 55553, 3 rd Ave SE - 2 nd Street SE to 6 th Street SE, Rochester, MN, And 6 th Street SE - 3 rd Ave SE to East BRT Terminus Round-A-Bout TYPE OF WORK Grading, Aggregate Base, Plant Mixed Bituminous Pavement, Concrete Pavement, Concrete Curb & Gutter, ADA Improvements, Sidewalk, Driveways, Storm Sewer, Sanitary Sewer, Watermain, Signing and Striping, Signal Lighting, Street Lighting, BRT Platforms Electric & Technology, Landscaping and Related Appurtenances, Bridge Enhancements and Modifications. LENGTH 2.675 miles - 2 nd Street SW STARTING DATE: June 1, 2025 LENGTH 0.361 miles - 2 nd Street SW COMPLETION DATE: August 19, 2027 The Workforce Employment Utilization Goals set forth below are expressed in percentage terms for the total hours of labor performed on the project by minority and female construction workers. i. 15% People of Color/Indigenous People Utilization of Total Project Labor Hours. ii. 9% in Female Utilization of Total Project Labor Hours

Bid Results

Water / Sewer

$21,284,394.00

Public - City

Site Work

758

19

7

4

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
213
Active Projects
90
Bidding Soon
1,436
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 15, 2025

June 1, 2025

Project location map

Multiple Locations, Rochester, MN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.