Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published April 24, 2025 at 8:00 PM
Updated April 25, 2025
Site work for a water / sewer project in Rochester, Minnesota. Completed plans call for site work for a water / sewer project.
Name: J8707 Vol B Civil Underground Utilities and Infrastructure Construction Project The work includes the following approximate quantities of work: Excavation-Common 15981 CY Common Embankment 2242 CY Concrete Pavement 7.0" 6480 SY Concrete Pavement 8.5" 12250 SY Full Depth Repair (Type CD-HV) 280 LF Pavement Replacement (Type CX) 1610 SY 12" RC Pipe Sewer Des 3006 CL V 2822 LF 8" Watermain Ductile Iron CL 52 1511 LF 12" Watermain Ductile Iron CL 52 1918 LF Const Drainage Structure Des 48-4020 489.5 LF 5" Concrete Walk 33430 SF 6" Concrete Walk 14410 SF 5" Colored Concrete Walk 19150 SF Concrete Curb & Gutter Design B624 (MOD) 5510 LF Lighting Units - Type Special, Special 1, Special 2 49 EACH Traffic Control Signal Systems - E, F, M 3 SYS Temporary Signal Systems - D, E, F, H, N 5 SYS Revise Signal Systems - B, D, H, L 4 SYS 6" Solid Line Multi Comp GR IN 15063 LF 8" Solid Line Multi Comp GR IN 13549 LF J NO. 8707 FEDERAL CIG and STATE AID PROJECT NO. TRF-0047-018B and 159-106-020 LOCATION: 2 nd St SW - 31 St Ave SW to 3 rd Ave SE, Rochester, MN, Existing Bridge 55051 and Existing Bridge 55553, 3 rd Ave SE - 2 nd Street SE to 6 th Street SE, Rochester, MN, And 6 th Street SE - 3 rd Ave SE to East BRT Terminus Round-A-Bout TYPE OF WORK Grading, Aggregate Base, Plant Mixed Bituminous Pavement, Concrete Pavement, Concrete Curb & Gutter, ADA Improvements, Sidewalk, Driveways, Storm Sewer, Sanitary Sewer, Watermain, Signing and Striping, Signal Lighting, Street Lighting, BRT Platforms Electric & Technology, Landscaping and Related Appurtenances, Bridge Enhancements and Modifications. LENGTH 2.675 miles - 2 nd Street SW STARTING DATE: June 1, 2025 LENGTH 0.361 miles - 2 nd Street SW COMPLETION DATE: August 19, 2027 The Workforce Employment Utilization Goals set forth below are expressed in percentage terms for the total hours of labor performed on the project by minority and female construction workers. i. 15% People of Color/Indigenous People Utilization of Total Project Labor Hours. ii. 9% in Female Utilization of Total Project Labor Hours
Bid Results
Water / Sewer
$21,284,394.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 15, 2025
June 1, 2025
Multiple Locations, Rochester, MN
Related To This Project
Rochester, MN
Bid Date: Mar 31 2025
Rochester, MN
Bid Date: Apr 01 2025
Rochester, MN
Bid Date: Mar 27 2025
Rochester, MN
Bid Date: Apr 22 2025
Rochester, MN
Bid Date: Apr 03 2025
Rochester, MN
Bid Date: Apr 22 2025
Rochester, MN
Bid Date: Apr 01 2025
Rochester, MN
--
Rochester, MN
--
Rochester, MN
Bid Date: Apr 01 2025
Rochester, MN
Bid Date: Apr 10 2025
Rochester, MN
Bid Date: Apr 09 2025
Rochester, MN
Bid Date: Apr 09 2025
Rochester, MN
Bid Date: Apr 11 2025
Rochester, MN
Bid Date: Apr 11 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
