EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 31, 2025 at 8:00 PM

Updated October 1, 2024

Site work for a water / sewer project in Rochester, Minnesota. Completed plans call for site work for a water / sewer project.

Name: J8707 Vol B Civil Underground Utilities and Infrastructure Construction Project The work includes the following approximate quantities of work: Excavation-Common 15981 CY Common Embankment 2242 CY Concrete Pavement 7.0" 6480 SY Concrete Pavement 8.5" 12250 SY Full Depth Repair (Type CD-HV) 280 LF Pavement Replacement (Type CX) 1610 SY 12" RC Pipe Sewer Des 3006 CL V 2822 LF 8" Watermain Ductile Iron CL 52 1511 LF 12" Watermain Ductile Iron CL 52 1918 LF Const Drainage Structure Des 48-4020 489.5 LF 5" Concrete Walk 33430 SF 6" Concrete Walk 14410 SF 5" Colored Concrete Walk 19150 SF Concrete Curb & Gutter Design B624 (MOD) 5510 LF Lighting Units - Type Special, Special 1, Special 2 49 EACH Traffic Control Signal Systems - E, F, M 3 SYS Temporary Signal Systems - D, E, F, H, N 5 SYS Revise Signal Systems - B, D, H, L 4 SYS 6" Solid Line Multi Comp GR IN 15063 LF 8" Solid Line Multi Comp GR IN 13549 LF J NO. 8707 FEDERAL CIG and STATE AID PROJECT NO. TRF-0047-018B and 159-106-020 LOCATION: 2 nd St SW - 31 St Ave SW to 3 rd Ave SE, Rochester, MN, Existing Bridge 55051 and Existing Bridge 55553, 3 rd Ave SE - 2 nd Street SE to 6 th Street SE, Rochester, MN, And 6 th Street SE - 3 rd Ave SE to East BRT Terminus Round-A-Bout TYPE OF WORK Grading, Aggregate Base, Plant Mixed Bituminous Pavement, Concrete Pavement, Concrete Curb & Gutter, ADA Improvements, Sidewalk, Driveways, Storm Sewer, Sanitary Sewer, Watermain, Signing and Striping, Signal Lighting, Street Lighting, BRT Platforms Electric & Technology, Landscaping and Related Appurtenances, Bridge Enhancements and Modifications. LENGTH 2.675 miles - 2 nd Street SW STARTING DATE: June 1, 2025 LENGTH 0.361 miles - 2 nd Street SW COMPLETION DATE: August 19, 2027 The Workforce Employment Utilization Goals set forth below are expressed in percentage terms for the total hours of labor performed on the project by minority and female construction workers. i. 15% People of Color/Indigenous People Utilization of Total Project Labor Hours. ii. 9% in Female Utilization of Total Project Labor Hours

GC Bidding

Water / Sewer

$4,000,000.00

Public - City

Site Work

758

19

3

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Work Restrictions, Administrative Requirements, Construction Progress Documentation, Scheduling of Work, Construction Progress Schedule, Submittal Procedures, Certificates, Special Procedures, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Temporary Utilities, Temporary Lighting, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Closeout Submittals, Warranties
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Facility Remediation, Transportation and Disposal of Hazardous Materials
Division 03 - Concrete

Division 03 - Concrete

Cast-in-Place Concrete, Concrete Finishing, Concrete Curing, Precast Concrete, Grouting
Division 04 - Masonry

Division 04 - Masonry

Masonry, Common Work Results for Masonry, Masonry Mortaring, Unit Masonry, Concrete Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Decorative Metal
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Fire and Smoke Protection, Applied Fireproofing
Division 08 - Openings

Division 08 - Openings

Hardware
Division 09 - Finishes

Division 09 - Finishes

Finishes, Maintenance of Finishes, Tiling, Flooring, Terrazzo Flooring, Carpeting, Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Exterior Specialties, Protective Covers, Other Specialties, Flags and Banners, Banners
Division 12 - Furnishings

Division 12 - Furnishings

Furniture, Seating
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Hangers and Supports for HVAC Piping and Equipment
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Low-Voltage Electrical Power Conductors and Cables, Hangers and Supports for Electrical Systems, Low-Voltage Electrical Distribution, Low-Voltage Circuit Protective Devices, Fuses, Lighting
Division 27 - Communications

Division 27 - Communications

Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Backfill, Compaction, Embankments, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Driven Piles, Concrete Piles, Cast-in-Place Concrete Piles, Bored Piles, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Operation and Maintenance of Planting, Mowing, Watering, Bases, Ballasts, and Paving, Base Courses, Aggregate Base Courses, Rigid Paving, Concrete Paving, Unit Paving, Paving Specialties, Pavement Markings, Planting
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities
Division 34 - Transportation

Division 34 - Transportation

Transportation, Transportation Signaling and Control Equipment, Roadway Signaling and Control Equipment, Traffic Signals
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists, Lifting Devices, Clamps, Manufacturing Equipment, Dies and Molds, Molds
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
133
Active Projects
88
Bidding Soon
980
All Active Projects
524
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 15, 2025

June 1, 2025

img_map_placeholder

Multiple Locations, Rochester, MN

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Link Rapid Transit - Volume B: Civil Package

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.