Published May 15, 2025 at 8:00 PM
Updated May 16, 2025
Site work for a water / sewer project in Postville, Iowa. Completed plans call for site work for a water / sewer project.
The extent of the work involved is the furnishing of labor and new materials for the construction of water main construction including: Excavation for water main construction, trenched & trenchless construction of water main, services, fire hydrants and miscellaneous associated work including cleanup, in accordance with the contract documents. The Proposal shall be made out on the form furnished by the City of Postville and obtained from WHKS & Co., Engineers, Planners, and Surveyors, and must be accompanied in a sealed envelope by either: (1) a certified check, or a cashier's check drawn on an Iowa bank, or a bank chartered under the laws of the United States, in an amount of 5% of bid amount; or (2) a certified share draft drawn on a credit union in Iowa or chartered under the laws of the United States, in an amount of 5% of bid amount; or (3) a bid bond executed by a corporation authorized to contract as a surety in the State of Iowa, in the penal sum of 5% of bid amount. The bid security must not contain any conditions either in body or as an endorsement thereon. The bid security shall be forfeited to the City as liquidated damages in the event the successful bidder fails or refuses to enter into contract within ten (10) days after the award of contract and post bond satisfactory to the City insuring the faithful fulfillment of the contract and the maintenance of said work, if required, pursuant to the provisions of this notice and the other contract documents. The City will accept bid bond forms that meet the Requirements of Iowa Code, Section 26.8. Question Deadline 04/11/2025---Every request for such interpretation should be in writing addressed to WHKS & Co., 1412 6 th Street SW, P.O. Box 1467, Mason City, IA, 50402 and to be given consideration must be received at least five days prior to the date fixed for the opening of Bids. The Contractor shall commence work on or before the Late Start Date: June 27, 2025, and shall be completed on or before July 31st , 2025. The Contractor may begin work on the project before the Late Start Date; however, once the Contractor begins work on the project, all work shall progress in a continuous manner and shall be completed within 35 calendar days or less. Working days will begin to be charged whenever the Contractor begins work on the project. Charging of working days will begin on the Late Start Date if the Contractor has not started work prior to the Late Start Date. The successful bidder will be required to furnish a bond in an amount equal to one hundred (100) percent of the contract price, said bond to be issued by a responsible surety approved by the Owner and which shall guarantee a faithful performance of the Contract and the terms and conditions therein contained and shall guarantee the prompt payment of all materials and labor and protect and save harmless the Owner from claims and damages of any kind caused by the operations of the Contractor and shall also guarantee the maintenance of the improvements constructed for a period of two (2) year(s) after completion and acceptance by the Owner.
Award
Water / Sewer
$397,394.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 17, 2025
June 27, 2025
N Lawler St, Postville, IA
Related To This Project
Postville, IA
Bid Date: Jun 10 2025
Postville, IA
Bid Date: Aug 07 2025
Postville, IA
Bid Date: Apr 08 2025
Postville, IA
Bid Date: Dec 05 2024
Postville, IA
Bid Date: Jun 21 2022
Postville, IA
Bid Date: Sep 05 2019
Postville, IA
Bid Date: Jun 09 2022
Cedar Rapids, IA
Bid Date: Apr 10 2025
Newton, IA
--
Reasnor, IA
Bid Date: Nov 18 2025
Havelock, IA
--
Collins, IA
--
Cambridge, IA
--
Manning, IA
--
Clarion, IA
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.