BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 12, 2025 at 7:00 PM

Updated November 13, 2025

Site work and paving for a mixed-use development in Minneapolis, Minnesota. Conceptual plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Participate in the City of Brooklyn Center's project to reconstruct Humboldt Avenue (CSAH 57) from 53rd Avenue to 57th Avenue in the City of Brooklyn Center. Purpose & Description: The existing roadway (last reconstructed in 1930) includes a rural environment that lacks curb and storm water structures to provide adequate drainage. Humboldt Avenue (CSAH 57) is one of the few remaining county roadways within the I-494/I-694 ring that includes a rural design. In addition, sidewalk facilities are currently limited to the west side of the roadway. The City of Brooklyn Center has indicated an interest in leading this capital project as there are city owned utilities that warrant replacement based on their current age and condition. The existing sanitary sewer consists of vitrified clay pipe (installed in 1952) that is experiencing root intrusion along approximately 50% of the system. Alternatively, the existing water system consists of cast iron pipe (installed in 1966) that is also experiencing corrosion. Staff recommends performing roadway reconstruction activities in conjunction with utility replacement to not only minimize capital costs, but also to reduce delays to the traveling public. It is anticipated that the proposed project will upgrade the corridor to a suburban design to better serve its users. Project elements likely will include new pavement, curb to provide sufficient drainage and upgraded ADA accommodations to better serve people with limited mobility. Additionally, in the 2000s, Housing and Economic Development completed a reconstruction project on Humboldt Avenue (CSAH 57) between Victory Memorial Drive and 53rd Avenue as part of the Humboldt Greenway partnership with the City of Minneapolis. This project presents an opportunity to implement a similar roadway design and streetscaping elements to encourage walking and biking along the corridor. The project is included in the County 2026-2030 Capital Improvement Program (CIP). As of November 12, 2025, further details have not yet been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Roads / Highways

$10,000,000.00

Public - County

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
252
Active Projects
146
Bidding Soon
1,421
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 1, 2027

Project location map

N Humboldt Ave, Minneapolis, MN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.