BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 1, 2025 at 8:00 PM

Updated April 22, 2025

Renovation of a water / sewer project in Pendleton, Indiana. Completed plans call for the renovation of a water / sewer project.

Pursuant to Indiana Code 5-23-5, notice is hereby given that the Fall Creek Regional Waste District, Pendleton, Indiana (the District) will receive sealed proposals and statements of qualifications (PSOQs) to develop, construct, operate, and transfer the replacement of equipment for Primary Clarifiers Nos. 1 & 3 (the Project) Selection of a qualified operator (Operator) is anticipated to be finalized on or about May 15,2025. The District hereby requests PSOQs from Operators to provide all construction services, design review and value engineering assistance, site work, labor, and material to develop and construct the Project. The Work to be performed under this Agreement consists of providing all labor, equipment, material, supplies, tools, and supervision necessary to properly remove and dispose of existing primary clarifier equipment in Primary Clarifiers Nos. 1 & 3 and install new primary clarifier equipment procured by FCRWD in accordance with drawings and specifications. Also included in the work is the interior concrete coating of Primary Clarifier No. 1. The FCRWD is currently undergoing a similar project for the installation of new primarily clarifier equipment in Primary Clarifier No. 2. The sequence of the work must follow substantial completion of the Primary Clarifier No. 2 work already in progress, with installation of Primary Clarifier No. 3 equipment first followed by Primary Clarifier No. 1 equipment second. This notice includes a summary of the RFPQ. However, potential Operators should obtain the complete RFPQ guidelines by contacting Vee Carter by email, vcarter@grwinc.com . At the District's discretion, to further assist in evaluation, some, one, or all responding Operators may be requested to participate in discussions or negotiations. At the District's discretion, the District may directly negotiate with any Operator on specifications, price, or any other aspect of the PSOQ. The FCRWD reserves the right to reject any and all proposals and/or to waive any informalities herein.

Post-Bid

Water / Sewer

$300,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
210
Active Projects
103
Bidding Soon
1,872
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 21, 2025

December 1, 2025

Project location map

9378 S 650 W, Pendleton, IN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.