Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published April 1, 2025 at 8:00 PM
Updated April 22, 2025
Renovation of a water / sewer project in Pendleton, Indiana. Completed plans call for the renovation of a water / sewer project.
Pursuant to Indiana Code 5-23-5, notice is hereby given that the Fall Creek Regional Waste District, Pendleton, Indiana (the District) will receive sealed proposals and statements of qualifications (PSOQs) to develop, construct, operate, and transfer the replacement of equipment for Primary Clarifiers Nos. 1 & 3 (the Project) Selection of a qualified operator (Operator) is anticipated to be finalized on or about May 15,2025. The District hereby requests PSOQs from Operators to provide all construction services, design review and value engineering assistance, site work, labor, and material to develop and construct the Project. The Work to be performed under this Agreement consists of providing all labor, equipment, material, supplies, tools, and supervision necessary to properly remove and dispose of existing primary clarifier equipment in Primary Clarifiers Nos. 1 & 3 and install new primary clarifier equipment procured by FCRWD in accordance with drawings and specifications. Also included in the work is the interior concrete coating of Primary Clarifier No. 1. The FCRWD is currently undergoing a similar project for the installation of new primarily clarifier equipment in Primary Clarifier No. 2. The sequence of the work must follow substantial completion of the Primary Clarifier No. 2 work already in progress, with installation of Primary Clarifier No. 3 equipment first followed by Primary Clarifier No. 1 equipment second. This notice includes a summary of the RFPQ. However, potential Operators should obtain the complete RFPQ guidelines by contacting Vee Carter by email, vcarter@grwinc.com . At the District's discretion, to further assist in evaluation, some, one, or all responding Operators may be requested to participate in discussions or negotiations. At the District's discretion, the District may directly negotiate with any Operator on specifications, price, or any other aspect of the PSOQ. The FCRWD reserves the right to reject any and all proposals and/or to waive any informalities herein.
Post-Bid
Water / Sewer
$300,000.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 21, 2025
December 1, 2025
9378 S 650 W, Pendleton, IN
Related To This Project
Pendleton, IN
--
Pendleton, IN
Bid Date: Dec 11 2025
Pendleton, IN
Bid Date: Apr 03 2025
Pendleton, IN
Bid Date: Nov 14 2024
Pendleton, IN
--
Pendleton, IN
Bid Date: Aug 27 2024
Pendleton, IN
Bid Date: Aug 01 2024
Pendleton, IN
Bid Date: Aug 01 2024
Pendleton, IN
Bid Date: May 09 2024
Pendleton, IN
Bid Date: Mar 20 2024
Pendleton, IN
Bid Date: Aug 04 2020
Pendleton, IN
Bid Date: Jun 08 2021
Pendleton, IN
Bid Date: Aug 31 2021
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
