BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 18, 2025 at 8:00 PM

Updated April 19, 2025

Demolition, site work and addition to a municipal facility in Conroe, Texas. Completed plans call for the addition of a 22,275-square-foot municipal facility.

This is the final bid for the Caney Creek Transportation Center Phase 02. Brookstone is the Construction Manager for this project. This project includes work at two different sites: Caney Creek Transportation Center and North Transportation Center. Construction will occur simultaneously, and construction is expected to start in May 2025. The project includes 14,796 SF of additions to the west and east sides of the Caney Creek Transportation Center. These single-story pre-engineered metal building expansions will extend the lobby and bullpen areas and add spaces such as offices, conference rooms, storage areas and shop bays. Work at the North Transportation Center includes the renovation of a portion of the existing parking lot. Due date: Bid proposals are due by April 17, 2025, at 2:00 PM Brookstone Estimator: Email bid proposals to Leslie Lagunas at llagunas@brookstone-tx.com. Note the following: This project is exempt from sales tax on incorporated materials. 00 73 50 Houston Prevailing Wage Rates Anticipated construction start: May 2025 Background checks apply *Geotech Report has been released. *We’re having an optional pre-bid meeting and site walk this Thursday, April 3. Caney Creek Transportation Center at 2:00 PM 13735 Grangerland Rd, Conroe, TX 77306 North Transportation Center at 4:00 PM (right after Caney Creek) 823-809 N Fwy Service Rd, Conroe, TX 77301 If you arrive at 4:00 PM or later for the North Transportation Center, you can park at Armstrong Elementary. This is the only time Brookstone will arrange for subcontractors to visit the site and check out the existing conditions. It’s not required to attend, but it’s a good chance for interested subcontractors to see everything in person. Please submit any questions in writing to Leslie Lagunas at llagunas@brookstone-tx.com. *I want to clarify that the North Transportation Center is an existing building, and no work will be done inside except for the alternates listed below. The base bid ONLY includes the pavement replacement. The alternates that affect the building are: Alt No. 02: Adding power and motorized operation to all overhead coiling doors (OHCD). At North Transportation Center. Alt No. 03: Intrusion alarm, door hardware, and security cameras. At North Transportation Center. WORK COVERED BY CONTRACT DOCUMENTS A. The Work of Project is defined by the Contract Documents and consists of the following: Administration & Operations, Training, and Shop Bay & Support Spaces. While the departments work cohesively, each division has individual functions and procedures. The goals for the facility include: 1. Creating open spaces for collaborative training assembly 2. Incorporating future growth within staffing and maintenance resources 3. Organized hierarchy within programs 4. Seamless transition between new and existing functions and materiality 5. Adding program to facilitate Shop Bay and Building Operations needs The Caney Creek Transportation Center additions extend the Phase 01 segment of the project, which finished construction in 2023. The first phase of the project included an open lobby, administrative offices, a conference room, bullpen collaborative open offices, female and male restrooms, a kitchen, a mail room, storage, three shop bays, shop offices, a parts mezzanine, and mechanical support spaces. *Addendum 01 has been released. *Please submit any questions by 4/10/25 so they can make it in the next addendum. *Addendum 02 has been released. This addendum includes revisions to the civil, structural, architectural, electrical, and technology drawings. Additionally, new sheet TS-101 Site Technology Plan has been added. Several specifications have also been revised. Please review and acknowledge in your proposal. As you review the original plans and Addendum 2, please email any additional questions to my email llagunas@brookstone-tx.com This addendum includes revisions to the civil, structural, architectural, mechanical, plumbing, electrical, and technology drawings. Additionally, new sheet drawings LP-101 (Lubrication System Floor Plan) and LP-200 (Lubrication Schedules, Details, and Schematics) have been added. Several specifications have also been revised. Please review and acknowledge in your proposal. As you review the original plans and Addendum 1, please email any additional questions to my email llagunas@brookstone-tx.com *We have uploaded pictures taken from the site visit. *Attached is the RFI log with responses. Some of these questions were already answered in previous addenda, and others will be addressed in upcoming ones. Please review. *ADDENDUM 03 and Updated RFI Log have been released. This addendum includes revisions to architectural drawings and alternate list. Spec section 08 56 50 Transaction Windows was added. *Addendum 4 has been released. This addendum includes changes to the floor schedules to clarify Div. 08. It also removed sheet S-101C from the project.

Post-Bid

Municipal

$2,000,000.00

Public - City

Addition, Demolition, Site Work

132

48

98

2

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
376
Active Projects
190
Bidding Soon
3,376
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 17, 2025

May 1, 2025

Project location map

13735 Grangerland Rd, Conroe, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.