Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published April 5, 2025 at 8:00 PM
Updated October 1, 2024
Renovation of a transportation facility in Louisville, Kentucky. Completed plans call for the renovation of a transportation facility.
This project consists of: Contracting for alterations and modificationsto existing privately owned and occupied residences of various types and sizes in the City of Louisville. Acoustical treatments will be added to Twenty - eight (28) dwellings to achieve an interior reduction of noise from aircraft. The work includes, but is not limited to, the replacement of existing windows, doors, mechanical and electrical modifications and related items required as part of the work. The Contractor is allotted six (6) working days for single-family residences with doors & windows only, nine (9) working daysforsingle-family residences with doors & windows & HVAC and fifteen (15) working daysfor multi-family residences for contract work from commencement of scheduled physical construction of each individual dwelling. Contractor is allowed five (5) additional calendar days to complete Asbestos Containing Materials (ACMs) removal for each home requiring such work. ACMs removal work shall be completed prior to commencement of construction. The Contractor shall complete the contract within Two Hundred Ninety (290) calendar days from receipt of written Preliminary Notice to Proceed (P/NTP) by the Authority. Each sealed Bid shall be accompanied by an irrevocable Bank Letter of Credit, or satisfactory Bid Bond with good corporate surety, in a sum not less than ten percent (10%) of the aggregate amount of the Bid, payable without condition to the Owner, to guarantee that if the Bidder's offer results in an Award, the Bidder will furnish all required bonds, insurance certificate(s) and insurance policy(ies) within ten Calendar Days after the date Notice of Award is given, and enter into the Contract within thirty (30) days after Notice of Award is given.
Post-Bid
Transportation Terminals
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Division 01 - General Requirements
Division 02 - Existing Conditions
Division 04 - Masonry
Division 05 - Metals
Division 06 - Wood, Plastics, and Composites
Division 07 - Thermal and Moisture Protection
Division 08 - Openings
Division 09 - Finishes
Division 10 - Specialties
Division 11 - Equipment
Division 22 - Plumbing
Division 23 - Heating Ventilating and Air Conditioning
Division 26 - Electrical
Division 28 - Electronic Safety and Security
Division 31 - Earthwork
Division 33 - Utilities
Division 34 - Transportation
Division 44 - Pollution Control Equipment
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 3, 2025
May 5, 2025
600 Terminal Dr, Louisville, KY
Related To This Project
Louisville, KY
--
Louisville, KY
Bid Date: Apr 02 2025
Louisville, KY
Bid Date: Apr 22 2025
Louisville, KY
Bid Date: Apr 21 2025
Louisville, KY
Bid Date: Apr 16 2025
Louisville, KY
Bid Date: Apr 03 2025
Louisville, KY
Bid Date: Apr 23 2025
Louisville, KY
Bid Date: Apr 09 2025
Louisville, KY
Bid Date: Sep 16 2021
Louisville, KY
Bid Date: Mar 17 2022
Louisville, KY
--
Louisville, KY
Bid Date: Apr 09 2025
Louisville, KY
Bid Date: Apr 16 2025
Louisville, KY
Bid Date: Apr 29 2025
Louisville, KY
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
.webp)
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
.webp)
Upgrade now for industry‑leading commercial construction data.
You've reached the free-view limit.
Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.