EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 5, 2025 at 8:00 PM

Updated October 1, 2024

Renovation of a transportation facility in Louisville, Kentucky. Completed plans call for the renovation of a transportation facility.

This project consists of: Contracting for alterations and modificationsto existing privately owned and occupied residences of various types and sizes in the City of Louisville. Acoustical treatments will be added to Twenty - eight (28) dwellings to achieve an interior reduction of noise from aircraft. The work includes, but is not limited to, the replacement of existing windows, doors, mechanical and electrical modifications and related items required as part of the work. The Contractor is allotted six (6) working days for single-family residences with doors & windows only, nine (9) working daysforsingle-family residences with doors & windows & HVAC and fifteen (15) working daysfor multi-family residences for contract work from commencement of scheduled physical construction of each individual dwelling. Contractor is allowed five (5) additional calendar days to complete Asbestos Containing Materials (ACMs) removal for each home requiring such work. ACMs removal work shall be completed prior to commencement of construction. The Contractor shall complete the contract within Two Hundred Ninety (290) calendar days from receipt of written Preliminary Notice to Proceed (P/NTP) by the Authority. Each sealed Bid shall be accompanied by an irrevocable Bank Letter of Credit, or satisfactory Bid Bond with good corporate surety, in a sum not less than ten percent (10%) of the aggregate amount of the Bid, payable without condition to the Owner, to guarantee that if the Bidder's offer results in an Award, the Bidder will furnish all required bonds, insurance certificate(s) and insurance policy(ies) within ten Calendar Days after the date Notice of Award is given, and enter into the Contract within thirty (30) days after Notice of Award is given.

Post-Bid

Transportation Terminals

Public - City

Renovation

3

30

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Project Management and Coordination, Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cutting and Patching, Cleaning and Waste Management, Closeout Submittals, Bonds
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Facility Remediation, Transportation and Disposal of Hazardous Materials, Asbestos Remediation
Division 04 - Masonry

Division 04 - Masonry

Masonry, Maintenance of Masonry, Stone Cleaning, Stone Restoration, Unit Masonry, Clay Unit Masonry, Concrete Unit Masonry, Glass Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Metal Fabrications, Decorative Metal
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Heavy Timber, Finish Carpentry, Architectural Woodwork
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal Protection, Thermal Insulation, Roofing and Siding Panels, Siding
Division 08 - Openings

Division 08 - Openings

Openings, Doors and Frames, Wood Doors, Windows, Wood Windows, Plastic Windows, Roof Windows and Skylights, Hardware, Door Hardware, Window Hardware, Glazing, Louvers and Vents, Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Gypsum Board, Tiling, Flooring, Carpeting, Acoustic Treatment, Acoustic Wall Coating, Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Partitions, Storage Specialties, Postal Specialties, Exterior Specialties, Protective Covers
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Plumbing Insulation
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, HVAC Fans, Air Outlets and Inlets, Central Heating Equipment, Furnaces, Central HVAC Equipment
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Excavation and Fill, Fill
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Distribution Piping
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
108
Active Projects
64
Bidding Soon
955
All Active Projects
400
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 3, 2025

May 5, 2025

img_map_placeholder

600 Terminal Dr, Louisville, KY

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Residential Sound and Insulation Program

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.