Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published April 24, 2025 at 8:00 PM
Updated October 1, 2024
Site work and paving for a road / highway in Bay Minette, Alabama. Completed plans call for site work for a road / highway; and for paving for a road / highway.
Resurfacing Projects 2025 For Furnishing All Labor and Materials and Performing All Work Required by Baldwin County and Described as Follows: Baldwin Ounty Resurfacing Projects 2025: Group # 3/bcr-2025-3 Hw25069 Dairy Rd Section St to Us Hwy 98 Hw25054 County Rd 3 County Rd 24 to County Rd 32 Hw25070 County Rd 3 County Rd 13 to County Rd 24 Hw25073 Wood Acres Rd County Rd 3 to Eom Hw25072 Monk Rd County Rd 3 to Us Hwy 98 Hw25071 Langford Rd County Rd 48 to State Hwy 104 Hw25062 Long Rd County Rd 28 to County Rd 32 Hw25058 Bon Secour Hwy River Rd to County Rd 10 Hw25055 Nabors Ln Bon Secour Hwy to Eom Hw25066 Daughtery Rd Charme Rd to Bon Secour Hwy Hw25065 Charme Rd Bons Secour Hwy to Shutt Creek Ln Hw25068 County Rd 49 S Bon Secour Hwy to Eom Hw25059 James Harrison Rd County Rd 49 S to Eom Hw25060 Heritage Dr Bon Secour Hwy to Eom Hw25061 Kennedy Rd Bon Secour Hwy to Heritage Rd Hw25067 Heritage Cir Heritage Dr to Loop Hw25056 Southern Heir Dr Heritage Dr to Eom Hw25064 Britt Ln Heritage to Dr to Eom Hw25063 Witt Rd Bon Secour Hwy to Eom Hw25057 River Rd Bon Secour Hwy to Eom the Estimated Total Tonnage of Bituminous Plant Mix for Group 3 is Approximately 19,899 Tons Details concerning these roads and a map of their locations are included within the Contract Documents. The construction start date to be determined. If the Contractor wishes to begin work early, approval from Baldwin County must be obtained first. SIXTY (60) WORKING DAYS are allowed for the construction of Group 3/BCR-2025-3 A Working Day is defined as any calendar day from midnight to midnight, exclusive of Sundays and Legal Holidays, on which the Contractor could proceed with construction operations. Bad weather days may be considered non-working days at Baldwin County's discretion. All bids must be on blank forms provided in the Specifications and submitted in its entirety. A cashier's check drawn on an Alabama bank or a Bidder's Bond, payable to Baldwin County, Alabama, for an amount not less than five percent (5%) of the amount bid, but in no event more than ten thousand dollars ($10,000), shall be filed with the proposal The bidder's bond shall be prepared on the form specified and signed by a bonding company authorized to do business in the State of Alabama. A performance bond in the form and terms approved by the County in an amount not less than the contract price will be required at the signing of the contract. . A labor and materials bond in the form and terms approved by the County in an amount not less than fifty percent (50%) of the contract price insuring payment for all labor and materials shall also be required at the signing of the contract. The right is reserved to reject any and/or all bids and to waive informalities or irregularities and to furnish any item of material or work, and to change the amount of said contract. Liquidated damages for non-completion of the work within the time limit agreed upon will be assessed in accordance with the terms of the contract This shall include evidence of holding a current license from the State Licensing Board for General Contractors, Montgomery, Alabama, as required by Chapter 8 of Title 34 of the Code of Alabama (1975). In addition, non-residents of the State, if a corporation or any other entity, shall show evidence of having qualified with the Secretary of State to do business in the State of Alabama, if required by law. No bid shall be withdrawn for a period of thirty (30) days subsequent to the opening of bids without the consent of the County Commission of Baldwin County, Alabama. This project is 100% county funded. The estimated total tonnage of bituminous plant mix for Group 3 is approximately 19,899 tons. Details concerning these roads and a map of their locations are included within the Contract Documents. The construction start date to be determined. If the Contractor wishes to begin work early, approval from Baldwin County must be obtained first
Post-Bid
Roads / Highways
$400,000.00
Public - County
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Division 01 - General Requirements
Division 32 - Exterior Improvements
Division 34 - Transportation
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 23, 2025
May 23, 2025

Multiple Locations, Bay Minette, AL
Related To This Project
Bay Minette, AL
Bid Date: Apr 11 2025
Bay Minette, AL
Bid Date: Apr 22 2025
Bay Minette, AL
Bid Date: May 20 2025
Bay Minette, AL
Bid Date: Apr 23 2025
Bay Minette, AL
Bid Date: May 02 2025
Bay Minette, AL
Bid Date: Mar 26 2025
Bay Minette, AL
Bid Date: Mar 11 2025
Bay Minette, AL
Bid Date: Mar 27 2025
Bay Minette, AL
--
Bay Minette, AL
Bid Date: Feb 19 2025
Bay Minette, AL
Bid Date: Mar 06 2025
Bay Minette, AL
--
Bay Minette, AL
Bid Date: Feb 03 2025
Bay Minette, AL
Bid Date: Dec 17 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
.webp)
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
.webp)
Upgrade now for industry‑leading commercial construction data.
You've reached the free-view limit.
Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.