Renovation of a transportation facility in Cheyenne, Wyoming. Completed plans call for the renovation of a transportation facility.
Question: The provided images include the fire pump and its data plate, as well as some pictures of the solenoids; however, the images do not clearly show what the solenoids are connected to. Based on the available information, we are assuming these are solenoids for the fire pump controllers. Answer: These solenoids are for the pre-action system. Amendment 1 - Question asked to add photo's of Fire Pump data plate, Mechanical seals and Solenoids. Photo's added as Attachment #1 Fire Pump Inspection and Isolation Contractor shall perform a visual inspection of the fire pump(s), including but not limited to: Pump casing for signs of leaks, cracks, or corrosion Pump shaft and bearings for signs of wear or damage Suction and discharge valves for proper operation Pressure gauges and flow switches for proper function Contractor shall isolate the fire pump(s) from the fire suppression system, ensuring the system remains operational through backup or temporary means during the work. Contractor shall obtain client approval before proceeding with any work. Seal and Solenoid Replacement Contractor shall replace the following components on each fire pump: All mechanical seals All solenoid valves Contractor shall use only new, manufacturer-recommended replacement parts. Contractor shall clean and inspect all mating surfaces before installing new seals and solenoids. Contractor shall follow manufacturer specifications and industry best practices for installation and torquing procedures. Clean Up and Demobilization After replacing the seals and solenoids, the contractor shall reinstate the fire pump(s) into the fire suppression system. Contractor shall perform a comprehensive test of the fire pump(s) and associated systems, including but not limited to: Flow tests to verify pump Pressure tests to verify system integrity Alarm and control system functionality Contractor shall record and submit all test results to the client for review and approval.
Post-Bid
Transportation Terminals
$135,000.00
Public - Federal
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
7
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 6, 2025
September 8, 2025
217 Dell Range Blvd, Cheyenne, WY
Related To This Project
Cheyenne, WY
Bid Date: Apr 29 2025
Cheyenne, WY
Bid Date: Apr 17 2025
Cheyenne, WY
Bid Date: Jun 10 2025
Cheyenne, WY
Bid Date: Apr 30 2025
Cheyenne, WY
Bid Date: Apr 30 2025
Cheyenne, WY
Bid Date: Apr 29 2025
Cheyenne, WY
Bid Date: Jun 05 2025
Cheyenne, WY
Bid Date: Apr 11 2025
Cheyenne, WY
--
Cheyenne, WY
Bid Date: Mar 31 2025
Cheyenne, WY
Bid Date: May 01 2025
Cheyenne, WY
Bid Date: May 23 2025
Cheyenne, WY
Bid Date: Apr 16 2025
Cheyenne, WY
Bid Date: Aug 29 2024
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.