BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 13, 2025 at 8:00 PM

Updated June 14, 2025

Renovation of an educational facility in Jackson, Georgia. Completed plans call for the renovation of a educational facility.

Painting of Interior and Exterior of Jackson High School With the support of the Butts County community, we serve roughly 3,500 of Georgia's finest students at five schools. The System's board offices are located at 181 North Mulberry Street, Jackson, GA 30233. The Butts County School System is soliciting proposals for a contractor to provide necessary cleaning, preparation and painting services at Jackson High School. Prior to work, contactor is responsible for examination of present surface(s), testing and insuring that the paint will adhere and have a proper finish. This work should include all necessary equipment, materials and labor to complete all scope of work. The Butts County School System issues this invitation to bid for services at the following location. Work shall begin May 28, 2025 and be complete before July 12, 2025. All interior areas of the above schools - interior sq. footage is as follows: Jackson High School - 177,331 sq ft. Maps can be found at the end of this RFP Pre and Post Painting Moving all furniture from walls and away from any paint spillage or splatter and moving back to its original space Testing and examination of present surface(s), testing and insuring that the paint will adhere and have a proper finish. Contractor is liable for any damages Interior/Exterior Painting o Repainting school building interior as shown on attached drawings. o All interior and exterior metal door, door frames and door window frames will be painted on both sides, to include bus ramp areas. o All painting shall be brushed and rolled with two coats. No paint spraying equipment will be allowed. o Caulking around all openings in building (windows and doors) where caulk is missing and/or needs to be replaced. o Painting all hollow metal door, window and mechanical louver frames (interior and exterior - both sides of frames) o Removal of loose window caulking at all windows (interior and exterior, as required) o Caulk all openings where expansion shields, picture hangers or penetrating items have been removed. o Rope and caulk all control and expansion joints on interior of building o Caulk all expansion joints as needed o Paint all hollow metal handrails and guardrails, if applicable o Paint all previously painted concrete block and gypsum board walls, EFIS, bulkheads and ceilings. o First coat of paint shall be two shades darker than final coat to allow for inspection of first coat.

Award

Educational

$135,000.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

4

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
48
Active Projects
2
Bidding Soon
1,117
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 25, 2025

May 28, 2025

Project location map

717 S Harkness St, Jackson, GA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.